Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 19, 2019, 04:25 AM
  • 18 1074_18 1073 _03182019_220306.mp4

Date
03/18/2019
W/O
756041
Weather
Dry
Operator/Surveyor
E.RUIZ
Sewer ID
Z00682
PipeID
P14933
Time
9:25 PM
Certificate
U-715-07000753
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6480
Sewer Name
18 LA HABRA HEIGHTS TRUNK, SECTION 5
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
22
Purpose
Routine Assessment
Project
RFIR_WO_756041_TV18185_MAR2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
18 1074
Downstream MH
18 1073
Dir. of Survey
Downstream
Length Surveyed
207.3 ft.
Total Length
207.3 ft.
Structural Index
4
Structural Quick
4E33
Structural Rating
135
O&M Index
1
O&M Quick
1100
O&M Rating
1
Overall Index
4
Overall Quick
Overall Rating
136
Pipe schematic from manhole 18 1074 to 18 1073
MH: 18 1074MH: 18 1073downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 10740 ft. MGO - General Observation - CONNNECTION IN MH AT 3 OCLOCK ACTIVE0 ft. MWM - Water Mark, 15 %of cross sectional area4 ft. CL - Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES7.2 ft. FM - Fracture Multiple, from 11 to 01 o'clock, within 8 inches of joint: YES10.6 ft. RFJ - Roots Fine Joint, from 08 to 12 o'clock, within 8 inches of joint: YES10.6 ft. CM - Crack Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES23 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES25.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES34.9 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start78.8 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 8"109.6 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish119.4 ft. FL - Fracture Longitudinal, at 10 o'clock, within 8 inches of joint: YES123.1 ft. FM - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES129 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start154.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 8"171.6 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish174.3 ft. CH2 - Crack Longitudinal Hinge, 2, from 08 to 04 o'clock, within 8 inches of joint: YES186.3 ft. FM - Fracture Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES198.7 ft. FM - Fracture Multiple, from 11 to 01 o'clock, within 8 inches of joint: YES203.3 ft. FM - Fracture Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES207.3 ft. AMH - Downstream Manhole, Survey Ends - 18 1073

Observation photos (14)

  • Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES

    4 ft. - Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 11 to 01 o'clock, within 8 inches of joint: YES

    7.2 ft. - Fracture Multiple, from 11 to 01 o'clock, within 8 inches of joint: YES

  • Roots Fine Joint, from 08 to 12 o'clock, within 8 inches of joint: YES

    10.6 ft. - Roots Fine Joint, from 08 to 12 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES

    10.6 ft. - Crack Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    23 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    25.5 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    34.9 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Longitudinal, at 10 o'clock, within 8 inches of joint: YES

    119.4 ft. - Fracture Longitudinal, at 10 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    123.1 ft. - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    129 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Longitudinal Hinge, 2, from 08 to 04 o'clock, within 8 inches of joint: YES

    174.3 ft. - Crack Longitudinal Hinge, 2, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES

    186.3 ft. - Fracture Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 11 to 01 o'clock, within 8 inches of joint: YES

    198.7 ft. - Fracture Multiple, from 11 to 01 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES

    203.3 ft. - Fracture Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES

Observations (23)

DistanceCodeObservation
203.3FM
207.3AMH18 1073
78.8TFA
109.6FM
171.6FM
123.1FM
4CL
7.2FM
34.9FM
10.6RFJ
0MWL
186.3FM
119.4FL
25.5CM
154.2TFA
174.3CH2
0AMH18 1074
198.7FM
0MGOCONNNECTION IN MH AT 3 OCLOCK ACTIVE
129FM
23FM
0MWM
10.6CM

Properties (5)

custom_field_two
2
customer
LACSD
datetime
2019-03-18T21:25:35-07:00
documentation
PROPIPE
is_lateral_inspection
false