Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 15, 2019, 07:31 AM
  • 05 0928_05 0927 _03152019_004531.mp4

Date
03/15/2019
W/O
755855
Weather
Dry
Operator/Surveyor
E.RUIZ
Sewer ID
Z00547
PipeID
P06160
Time
12:31 AM
Certificate
U-715-07000753
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6476
Sewer Name
05 120TH STREET EXTENSION TRUNK
City
HAWTHORNE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
12
Purpose
Routine Assessment
Project
RFIR_WO_755855_TV05175_MAR2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
05 0928
Downstream MH
05 0927
Dir. of Survey
Downstream
Length Surveyed
327.1 ft.
Total Length
327.1 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
3
Pipe schematic from manhole 05 0928 to 05 0927
MH: 05 0928MH: 05 0927downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - CONNECTIONS AT BOTH 3 AND 9 O' CLOCK AT MH0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 09286 ft. MGO - General Observation - MAGNEZIUM H.O COATING start6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start79.8 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 8"132 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 8"184.8 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 8"236.1 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 8"291.3 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 8"324.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish324.8 ft. MGO - General Observation - MAGNEZIUM H.O COATING finish327.1 ft. AMH - Downstream Manhole, Survey Ends - 05 0927

Observations (14)

DistanceCodeObservation
79.8TFC
324.8MGOMAGNEZIUM H.O COATING finish
324.7SAP
0MWL
0MGOCONNECTIONS AT BOTH 3 AND 9 O' CLOCK AT MH
6MGOMAGNEZIUM H.O COATING start
132TFC
291.3TFC
0MWM
327.1AMH05 0927
0AMH05 0928
184.8TFC
6SAP
236.1TFC

Properties (5)

custom_field_two
2
customer
LACSD
datetime
2019-03-15T00:31:05-07:00
documentation
PROPIPE
is_lateral_inspection
false