Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 20, 2018, 08:06 AM
  • 02 0261_02 0260_12202018_001924.mp4

Date
12/20/2018
W/O
740647
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00251
PipeID
P02572
Time
12:06 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6278
Sewer Name
02 DOWNEY-BELLFLOWER TRUNK
City
PICO RIVERA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
25
Purpose
Routine Assessment
Project
RFIR_WO_740647_TV02381_DEC2018
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
02 0261
Downstream MH
02 0260
Dir. of Survey
Downstream
Length Surveyed
356.7 ft.
Total Length
356.7 ft.
Structural Index
3
Structural Quick
3M00
Structural Rating
213
O&M Index
2
O&M Quick
412M
O&M Rating
146
Overall Index
3
Overall Quick
Overall Rating
359
Pipe schematic from manhole 02 0261 to 02 0260
MH: 02 0261MH: 02 0260downstream0 ft. MWL - Water Level, 35 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 02612 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start73.3 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"136.1 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"178.8 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"227.6 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"285 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"355 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish355 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish356.7 ft. AMH - Downstream Manhole, Survey Ends - 02 0260

Observation photos (2)

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
356.7AMH02 0260
355DAGS
285TFA
2CM
0MWL
2DAGS
355CM
73.3TFC
136.1TF
178.8TFC
227.6TFC
0MWM
0AMH02 0261

Properties (6)

additional_info
SC365394
custom_field_two
3
customer
LACSD
datetime
2018-12-20T00:06:02-08:00
documentation
PRO PIPE
is_lateral_inspection
false