Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 20, 2018, 06:22 AM
  • 02 2438_02 0266 _12192018_222336.mp4

Date
12/19/2018
W/O
740647
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00251
PipeID
P02581
Time
10:22 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6278
Sewer Name
02 DOWNEY-BELLFLOWER TRUNK
City
PICO RIVERA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
25
Purpose
Routine Assessment
Project
RFIR_WO_740647_TV02381_DEC2018
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
02 2438
Downstream MH
02 0266
Dir. of Survey
Downstream
Length Surveyed
275.8 ft.
Total Length
275.8 ft.
Structural Index
3
Structural Quick
3J00
Structural Rating
162
O&M Index
2
O&M Quick
412S
O&M Rating
206
Overall Index
2
Overall Quick
Overall Rating
368
Pipe schematic from manhole 02 2438 to 02 0266
MH: 02 2438MH: 02 0266downstream0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 02 24380 ft. MWM - Water Mark, 60 %of cross sectional area0 ft. MWL - Water Level, 50 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start3 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start38.9 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Start95.9 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"153.9 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"274.4 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish274.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish274.4 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Finish275.8 ft. AMH - Downstream Manhole, Survey Ends - 02 0266

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    3 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock,  , within 8 inches of joint: YES, Start

    38.9 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
153.9TFC
95.9TFC
0MGOACTIVE CONNECTION AT MH 3 O'CLOCK
38.9DAE
3CM
0AMH02 2438
0MWM
274.4CM
0MWL
2DAGS
274.4DAGS
275.8AMH02 0266
274.4DAE

Properties (6)

additional_info
SC365394
custom_field_two
3
customer
LACSD
datetime
2018-12-19T22:22:53-08:00
documentation
PRO PIPE
is_lateral_inspection
false