Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 18, 2018, 06:25 AM
  • 02 0277_02 0276 _12172018_222558.mp4

Date
12/17/2018
W/O
740647
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00251
PipeID
P02591
Time
10:25 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6276
Sewer Name
02 DOWNEY-BELLFLOWER TRUNK
City
PICO RIVERA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
22
Purpose
Routine Assessment
Project
RFIR_WO_740647_TV02381_DEC2018
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
02 0277
Downstream MH
02 0276
Dir. of Survey
Downstream
Length Surveyed
387.8 ft.
Total Length
387.8 ft.
Structural Index
3
Structural Quick
3N00
Structural Rating
225
O&M Index
2
O&M Quick
412T
O&M Rating
216
Overall Index
2
Overall Quick
Overall Rating
441
Pipe schematic from manhole 02 0277 to 02 0276
MH: 02 0277MH: 02 0276downstream0 ft. MWL - Water Level, 40 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 02770 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start6.3 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Start10.4 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start51.2 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"150.4 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"153.1 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Finish245.4 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"339.8 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"385 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish385 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish387.7 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK387.8 ft. AMH - Downstream Manhole, Survey Ends - 02 0276

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock,  , within 8 inches of joint: YES, Start

    6.3 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    10.4 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
385DAGS
387.8AMH02 0276
0MWL
387.7MGOACTIVE CONNECTION AT MH 9 O'CLOCK
0MWM
6.3DAE
10.4CM
385CM
0AMH02 0277
339.8TFC
51.2TFC
153.1DAE
245.4TFC
0MGOACTIVE CONNECTION AT MH 3 O'CLOCK
150.4TFC
2DAGS

Properties (6)

additional_info
SC365392
custom_field_two
3
customer
LACSD
datetime
2018-12-17T22:25:55-08:00
documentation
PRO PIPE
is_lateral_inspection
false