Wastewater/Activity/PacpInspection/1.0Dec 21, 2018, 06:35 AM
  • 02 0256_02 0255 _12202018_223535.mp4

Date
12/20/2018
W/O
740647
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00251
PipeID
P02565
Time
10:35 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6279
Sewer Name
02 DOWNEY-BELLFLOWER TRUNK
City
PICO RIVERA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
25
Purpose
Routine Assessment
Project
RFIR_WO_740647_TV02381_DEC2018
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
02 0256
Downstream MH
02 0255
Dir. of Survey
Downstream
Length Surveyed
387.4 ft.
Total Length
387.4 ft.
Structural Index
3
Structural Quick
3N00
Structural Rating
228
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
232
Pipe schematic from manhole 02 0256 to 02 0255
MH: 02 0256MH: 02 0255downstream0 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 02562 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start7.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start26.1 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"132.6 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"230 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"272.1 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"332.3 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"385.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish385.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish387.4 ft. AMH - Downstream Manhole, Survey Ends - 02 0255

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    7.5 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
132.6TFA
0MWM
0MWL
0AMH02 0256
385.6CM
332.3TFA
272.1TFA
7.5CM
2DAGS
26.1TFA
385.6DAGS
387.4AMH02 0255
230TFC

Properties (6)

additional_info
SC365395
custom_field_two
3
customer
LACSD
datetime
2018-12-20T22:35:29-08:00
documentation
PRO PIPE
is_lateral_inspection
false