Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 17, 2018, 10:36 AM
  • 02 0300_02 0299 _12172018_023753.mp4

Date
12/17/2018
W/O
740647
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00251
PipeID
P02614
Time
2:36 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6275
Sewer Name
02 DOWNEY-BELLFLOWER TRUNK
City
PICO RIVERA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
22A
Purpose
Routine Assessment
Project
RFIR_WO_740647_TV02381_DEC2018
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
02 0300
Downstream MH
02 0299
Dir. of Survey
Downstream
Length Surveyed
196.3 ft.
Total Length
196.3 ft.
Structural Index
3
Structural Quick
3G00
Structural Rating
114
O&M Index
2
O&M Quick
412G
O&M Rating
83
Overall Index
2
Overall Quick
Overall Rating
197
Pipe schematic from manhole 02 0300 to 02 0299
MH: 02 0300MH: 02 0299downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 03000 ft. MWM - Water Mark, 50 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start8.1 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start43.6 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"51.8 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"141 ft. RFJ - Roots Fine Joint, at 09 o'clock, within 8 inches of joint: YESR196.3 ft. AMH - Downstream Manhole, Survey Ends - 02 0299196.3 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK196.3 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish196.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    8.1 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Roots Fine Joint, at 09 o'clock, within 8 inches of joint: YESR

    141 ft. - Roots Fine Joint, at 09 o'clock, within 8 inches of joint: YESR

Observations (12)

DistanceCodeObservation
51.8TFC
43.6TBA
0MWL
8.1CM
196.3AMH02 0299
141RFJ
0AMH02 0300
0MWM
196.3MGOACTIVE CONNECTION AT MH 3 O'CLOCK
196.3CM
2DAGS
196.3DAGS

Properties (6)

additional_info
SC365391
custom_field_two
3
customer
LACSD
datetime
2018-12-17T02:36:50-08:00
documentation
PRO PIPE
is_lateral_inspection
false