Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 4, 2019, 06:16 AM
  • B 0693A_B 0693 _01032019_222813.mp4

Date
01/03/2019
W/O
740134
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00110
PipeID
P09364
Time
10:16 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6291
Sewer Name
B JOINT OUTFALL B - UNIT 8G
City
DUARTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
08
Purpose
Routine Assessment
Project
RFIR_WO_740134_TV22155_DEC2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
B 0693A
Downstream MH
B 0693
Dir. of Survey
Downstream
Length Surveyed
267.7 ft.
Total Length
267.7 ft.
Structural Index
3
Structural Quick
3C00
Structural Rating
60
O&M Index
2
O&M Quick
2J00
O&M Rating
106
Overall Index
2
Overall Quick
Overall Rating
166
Pipe schematic from manhole B 0693A to B 0693
MH: B 0693AMH: B 0693downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 0693A0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAG COATING THROUGHOUT 50%72.1 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"77.9 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"165.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start195.2 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"203 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"265.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish265.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish265.3 ft. MGO - General Observation - COCKROACHES IN MANHOLE267.7 ft. AMH - Downstream Manhole, Survey Ends - B 0693267.7 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK

Observation photos (5)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - MAG COATING THROUGHOUT 50%

    2 ft. - General Observation - MAG COATING THROUGHOUT 50%

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    165.4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    265.3 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (17)

DistanceCodeObservation
203TBA
265.3DAGS
2DAGS
0MWL
267.7AMHB 0693
265.3SAP
72.1TBA
0AMHB 0693A
165.4SAP
77.9TFA
265.3MGOCOCKROACHES IN MANHOLE
0MWM
0MGOCOCKROACHES IN MANHOLE
267.7MGOACTIVE CONNECTION AT MH 3 O'CLOCK
195.2TBA
2MGOMAG COATING THROUGHOUT 50%
0MGOACTIVE CONNECTION AT MH 9 O'CLOCK

Properties (6)

additional_info
SC365657
custom_field_two
2
customer
LACSD
datetime
2019-01-03T22:16:03-08:00
documentation
PRO PIPE
is_lateral_inspection
false