Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 4, 2019, 11:03 AM
  • B 0720_B 0719 _01042019_031913.mp4

Date
01/04/2019
W/O
740134
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00110
PipeID
P09394
Time
3:03 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6291
Sewer Name
B JOINT OUTFALL B - UNIT 8G
City
DUARTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
08
Purpose
Routine Assessment
Project
RFIR_WO_740134_TV22155_DEC2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
B 0720
Downstream MH
B 0719
Dir. of Survey
Downstream
Length Surveyed
413.1 ft.
Total Length
413.1 ft.
Structural Index
3
Structural Quick
3O00
Structural Rating
246
O&M Index
2
O&M Quick
2O00
O&M Rating
164
Overall Index
3
Overall Quick
Overall Rating
410
Pipe schematic from manhole B 0720 to B 0719
MH: B 0720MH: B 0719downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 07200 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start24.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"75.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"123.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"175.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"223.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"274.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"322.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"411.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish411.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish413.1 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK413.1 ft. MGO - General Observation - COCKROACHES IN MANHOLE413.1 ft. AMH - Downstream Manhole, Survey Ends - B 0719

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    413.1 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (17)

DistanceCodeObservation
413.1MGOACTIVE CONNECTION AT MH 3 O'CLOCK
123.7TFC
413.1MGOCOCKROACHES IN MANHOLE
274.2TFC
0MWL
223.2TFC
413.1AMHB 0719
175.1TFC
24.2TFC
0AMHB 0720
2DAGS
2.3SAP
75.2TFC
411.8DAGS
322.5TFC
0MWM
411.8SAP

Properties (6)

additional_info
SC365657
custom_field_two
2
customer
LACSD
datetime
2019-01-04T03:03:48-08:00
documentation
PRO PIPE
is_lateral_inspection