22 0778_22 0777 _12262018_221258.mp4
2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
55.8 ft. - Material Change, Vitrified clay pipe
56.4 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
79.5 ft. - Material Change, Concrete pipe (non-reinfored)
79.5 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
| Distance | Code | Observation |
|---|---|---|
| 55.8 | SAP | — |
| 55.8 | MMC | — |
| 2 | DAGS | — |
| 213.5 | MGO | ACTIVE CONNECTION AT MH 9 O'CLOC |
| 0 | MWM | — |
| 0 | MGO | ACTIVE CONNECTION AT MH 9 O'CLOCK |
| 79.5 | MMC | — |
| 213.5 | AMH | 22 0777 |
| 211.3 | DAGS | — |
| 79.5 | SAP | — |
| 0 | MWL | — |
| 56.4 | SSS | — |
| 136.3 | TBA | — |
| 79.5 | SSS | — |
| 155.2 | TFA | — |
| 211.3 | SAP | — |
| 2 | SAP | — |
| 0 | AMH | 22 0778 |