Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 20, 2019, 08:36 AM
  • 05 1605_05 1604_03202019_021121.mp4

Date
03/20/2019
W/O
755959
Weather
Dry
Operator/Surveyor
E.RUIZ
Sewer ID
Z00551
PipeID
P06829
Time
1:36 AM
Certificate
U-715-07000753
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6485
Sewer Name
05 203RD STREET TRUNK
City
TORRANCE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
27
Purpose
Routine Assessment
Project
RFIR_WO_755959_TV05176_MAR2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
05 1605
Downstream MH
05 1604
Dir. of Survey
Downstream
Length Surveyed
294.6 ft.
Total Length
294.6 ft.
Structural Index
4
Structural Quick
4K00
Structural Rating
232
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
232
Pipe schematic from manhole 05 1605 to 05 1604
MH: 05 1605MH: 05 1604downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 16052.8 ft. FH2 - Fracture Longitudinal Hinge, 2, from 09 to 03 o'clock, within 8 inches of joint: YES, Start13.2 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: YES, 8"41.2 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 8"83 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES, 8"94.4 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 8"153.9 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 8"186 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 8"209.4 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 8"270.9 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES, 8"291.1 ft. FH2 - Fracture Longitudinal Hinge, 2, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish294.6 ft. AMH - Downstream Manhole, Survey Ends - 05 1604

Observations (14)

DistanceCodeObservation
209.4TF
83TFA
2.8FH2
94.4TF
13.2TBA
0MWL
0MWM
294.6AMH05 1604
41.2TF
153.9TF
291.1FH2
270.9TFA
186TBA
0AMH05 1605

Properties (5)

custom_field_two
2
customer
LACSD
datetime
2019-03-20T01:36:10-07:00
documentation
PROPIPE
is_lateral_inspection
false