Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 11, 2019, 05:42 AM
  • H 1288_H 1287 _01102019_215545.mp4

Date
01/10/2019
W/O
745550
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z01183
PipeID
P17304
Time
9:42 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6301
Sewer Name
H JOINT OUTFALL H - UNIT 8L
City
AZUSA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
12
Purpose
Routine Assessment
Project
RFIR_WO_745550_TV22154_JAN2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
H 1288
Downstream MH
H 1287
Dir. of Survey
Downstream
Length Surveyed
309 ft.
Total Length
309 ft.
Structural Index
3
Structural Quick
3K2K
Structural Rating
305
O&M Index
2
O&M Quick
2K00
O&M Rating
122
Overall Index
2
Overall Quick
Overall Rating
427
Pipe schematic from manhole H 1288 to H 1287
MH: H 1288MH: H 1287downstream0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 12880 ft. MWL - Water Level, 30 %of cross sectional area2 ft. MGO - General Observation - MAG COATING THROUGHOUT 40%2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start72.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"307.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish307.3 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish307.3 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish309 ft. AMH - Downstream Manhole, Survey Ends - H 1287

Observation photos (4)

  • General Observation - MAG COATING THROUGHOUT 40%

    2 ft. - General Observation - MAG COATING THROUGHOUT 40%

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
2MGOMAG COATING THROUGHOUT 40%
2DAGS
309AMHH 1287
307.3DAGS
0MWM
0AMHH 1288
307.3SAP
2SSS
0MWL
307.3SSS
72.8TFC
2SAP

Properties (6)

additional_info
SC365667
custom_field_two
2
customer
LACSD
datetime
2019-01-10T21:42:28-08:00
documentation
PRO PIPE
is_lateral_inspection
false