Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 2, 2019, 10:53 AM
  • D 0106_D 0105 _01022019_030445.mp4

Date
01/02/2019
W/O
740289
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00156
PipeID
P10012
Time
2:53 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6308
Sewer Name
D JOINT OUTFALL D - UNIT 6
City
LAWNDALE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
16
Purpose
Routine Assessment
Project
RFIR_WO_740259_TV05172_DEC2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Width
33 in.
Upstream MH
D 0106
Downstream MH
D 0105
Dir. of Survey
Downstream
Length Surveyed
303.2 ft.
Total Length
303.2 ft.
Structural Index
3
Structural Quick
5J3K
Structural Rating
575
O&M Index
2
O&M Quick
2K00
O&M Rating
118
Overall Index
3
Overall Quick
Overall Rating
693
Pipe schematic from manhole D 0106 to D 0105
MH: D 0106MH: D 0105downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - D 01060 ft. MWM - Water Mark, 25 %of cross sectional area2.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start7.9 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Start30 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start303.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish303.2 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK303.2 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish303.2 ft. AMH - Downstream Manhole, Survey Ends - D 0105303.2 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Finish303.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    30 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
7.9DSZ
0MWL
2.3SSS
303.2SSS
303.2MGOCONNECTION AT MH 9 O'CLOCK
30SRV
303.2SRV
303.2AMHD 0105
0MGOCONNECTION AT MH 3 O'CLOCK
303.2DSZ
2.3SAP
0AMHD 0106
303.2SAP
0MWM

Properties (6)

additional_info
SC365492
custom_field_two
2
customer
LACSD
datetime
2019-01-02T02:53:42-08:00
documentation
PROPIPE
is_lateral_inspection
false