Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 3, 2019, 06:45 AM
  • D 0097_D 0096 _01022019_225816.mp4

Date
01/02/2019
W/O
740289
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00156
PipeID
P10003
Time
10:45 PM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6309
Sewer Name
D JOINT OUTFALL D - UNIT 6
City
LAWNDALE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
17
Purpose
Routine Assessment
Project
RFIR_WO_740259_TV05172_DEC2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Width
33 in.
Upstream MH
D 0097
Downstream MH
D 0096
Dir. of Survey
Downstream
Length Surveyed
313.2 ft.
Total Length
313.2 ft.
Structural Index
3
Structural Quick
5K3K
Structural Rating
615
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
615
Pipe schematic from manhole D 0097 to D 0096
MH: D 0097MH: D 0096downstream0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - D 00970 ft. MWL - Water Level, 20 %of cross sectional area2.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO, Start2.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start8.4 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start305.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"312.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish313.1 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish313.2 ft. MGO - General Observation - CAPPED LATERAL 9 O'CLOCK @ MH313.2 ft. AMH - Downstream Manhole, Survey Ends - D 0096313.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO, Finish

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO, Start

    2.4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.6 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    8.4 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
0MGOCONNECTION AT MH 9 O'CLOCK
2.6SSS
305.6TF
0MWM
0MGOCONNECTION AT MH 3 O'CLOCK
313.2MGOCAPPED LATERAL 9 O'CLOCK @ MH
312.9SSS
0AMHD 0097
313.1SRV
313.2AMHD 0096
0MWL
313.2SAP
2.4SAP
8.4SRV

Properties (6)

additional_info
SC365493
custom_field_two
2
customer
LACSD
datetime
2019-01-02T22:45:15-08:00
documentation
PROPIPE
is_lateral_inspection
false