Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 2, 2019, 11:40 AM
  • D 0102_D 0101 _01022019_035557.mp4

Date
01/02/2019
W/O
740289
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00156
PipeID
P10008
Time
3:40 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6308
Sewer Name
D JOINT OUTFALL D - UNIT 6
City
LAWNDALE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
17
Purpose
Routine Assessment
Project
RFIR_WO_740259_TV05172_DEC2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Width
33 in.
Upstream MH
D 0102
Downstream MH
D 0101
Dir. of Survey
Downstream
Length Surveyed
501.1 ft.
Total Length
501.1 ft.
Structural Index
3
Structural Quick
5S3S
Structural Rating
990
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
990
Pipe schematic from manhole D 0102 to D 0101
MH: D 0102MH: D 0101downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - D 01020 ft. MWL - Water Level, 10 %of cross sectional area2.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start10.5 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start501.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish501.1 ft. AMH - Downstream Manhole, Survey Ends - D 0101501.1 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish501.1 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK501.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.7 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.7 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    10.5 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
501.1SSS
10.5SRV
0MWM
2.7SSS
0AMHD 0102
501.1AMHD 0101
501.1SRV
0MWL
2.7SAP
501.1MGOCONNECTION AT MH 9 O'CLOCK
501.1SAP

Properties (6)

additional_info
SC365492
custom_field_two
2
customer
LACSD
datetime
2019-01-02T03:40:46-08:00
documentation
PROPIPE
is_lateral_inspection
false