Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 20, 2019, 09:56 AM
  • Section#5_H 0481_H 0480__5202019__I0142.mp4

Date
05/20/2019
W/O
0771738
Weather
Light Rain
Operator/Surveyor
MARTIN
Sewer ID
Z00181
PipeID
P10908
Time
2:56 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
I0142
Sewer Name
H JOINT OUTFALL H - UNIT 6
City
EL MONTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
29
Purpose
Routine Assessment
Project
20190521MDM_JOINT_OUTFALL_H_UNIT_6
Material
Reinforced Concrete Pipe
Shape
Circular
Height
54 in.
Upstream MH
H 0481
Downstream MH
H 0480
Dir. of Survey
Downstream
Length Surveyed
347.8 ft.
Total Length
347.8 ft.
Structural Index
3
Structural Quick
3N2M
Structural Rating
357
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
357
Pipe schematic from manhole H 0481 to H 0480
MH: H 0481MH: H 0480downstream0 ft. AMH - Upstream Manhole, Survey Begins - 5:35AM0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG UNDER MAG COAT2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT2 ft. MGO - General Observation - MAG COAT 98% START22.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - ACTIVE53.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG104.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG UNDER MAG COAT160.9 ft. SAP - Surface Aggregate Projecting, from 09 to 12 o'clock, within 8 inches of joint: NO - SEVERE AGG216.5 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 6" - ACTIVE255.4 ft. SAP - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERER AGG307.4 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 6" - ACTIVE347.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCREYTE UNDER MAG COAT347.4 ft. MGO - General Observation - 98% MAG COAT FINISH347.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG UNDER MAG COAT347.8 ft. AMH - Downstream Manhole, Survey Ends - 5:55AM

Observation photos (7)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG UNDER MAG COAT

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG UNDER MAG COAT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT

  • General Observation - MAG COAT 98% START

    2 ft. - General Observation - MAG COAT 98% START

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

    53.3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG UNDER MAG COAT

    104.9 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG UNDER MAG COAT

  • Surface Aggregate Projecting, from 09 to 12 o'clock, within 8 inches of joint: NO - SEVERE AGG

    160.9 ft. - Surface Aggregate Projecting, from 09 to 12 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERER AGG

    255.4 ft. - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERER AGG

Observations (17)

DistanceCodeObservation
104.9SAPSEVERE AGG UNDER MAG COAT
2SAPSEVERE AGG UNDER MAG COAT
347.4SSSBLISTERING PEELING CONCREYTE UNDER MAG COAT
255.4SAPSEVERER AGG
0AMH5:35AM
216.5TFACTIVE
160.9SAPSEVERE AGG
347.4MGO98% MAG COAT FINISH
2SSSBLISTERING PEELING CONCRETE UNDER MAG COAT
307.4TFACTIVE
347.8AMH5:55AM
53.3SAPSEVERE AGG
2MGOMAG COAT 98% START
347.4SAPSEVERE AGG UNDER MAG COAT
22.9TFACTIVE
0MWM
0MWL

Properties (6)

custom_field_three
98% MAG COAT
custom_field_two
4
customer
LACSD
datetime
2019-05-20T02:56:55-07:00
documentation
MARTIN,REVELES,OLIVER 111,RUVALCABA
is_lateral_inspection
false