Section#4_H 0482_H 0481__5202019__I0142.mp4
2 ft. - General Observation - MAG COAT 98% START
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT
2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG UNDER MAG COAT
8.7 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG
25 ft. - Surface Aggregate Projecting, from 12 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG
97.4 ft. - Surface Aggregate Projecting, from 08 to 12 o'clock, within 8 inches of joint: NO - SEVERE AGG
276.4 ft. - Surface Aggregate Projecting, from 11 to 01 o'clock, within 8 inches of joint: NO - SEVERE AGG
289.3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG
| Distance | Code | Observation |
|---|---|---|
| 97.4 | SAP | SEVERE AGG |
| 2 | MGO | MAG COAT 98% START |
| 276.4 | SAP | SEVERE AGG |
| 0 | MWM | — |
| 2 | SSS | BLISTERING PEELING CONCRETE UNDER MAG COAT |
| 289.3 | SAP | SEVERE AGG |
| 0 | AMH | 5:10AM |
| 355 | MGO | 98% MAG COAT FINISH |
| 8.7 | SAP | SEVERE AGG |
| 355 | SSS | BLISTERING PEELING CONCRETE FINISH UNDER MAG COAT |
| 2 | SAP | SEVERE AGG UNDER MAG COAT |
| 25 | SAP | SEVERE AGG |
| 0 | MWL | — |
| 355 | SAP | SEVERE AGG UNDER MAG COAT |
| 355.9 | AMH | 5:30AM |