Section#1_15 0320_H 0484__5202019__I0142.mp4
2 ft. - General Observation - MAG COAT 99% START
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE
31 ft. - Surface Aggregate Projecting, from 01 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG
134.7 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, - SEVERE AGG UNDER MAG COAT
154.2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
183.7 ft. - General Observation - 95% MAG COAT START
257.7 ft. - Surface Aggregate Projecting, from 09 to 12 o'clock, within 8 inches of joint: NO - SEVERE AGG
258.7 ft. - Surface Reinforcement Visible, from 10 to 11 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
304.3 ft. - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG
| Distance | Code | Observation |
|---|---|---|
| 0 | AMH | 3:30AM |
| 0 | MGO | MH CONN 9:00 ACTIVE LARGE INCOMING |
| 334.2 | SAP | SEVERE AGG |
| 2 | MGO | MAG COAT 99% START |
| 0 | MWL | — |
| 249.4 | TF | ACTIVE |
| 258.7 | SRV | CIRCUM REBAR |
| 0 | MWM | — |
| 334.2 | MGO | MH CONN 3:00 OPEN |
| 334.8 | AMH | 4:00AM |
| 304.3 | SAP | SEVERE AGG |
| 183.7 | MGO | 95% MAG COAT START |
| 31 | SAP | SEVERE AGG |
| 257.7 | SAP | SEVERE AGG |
| 2 | SSS | BLISTERING PEELING CONCRETE |
| 334.2 | MGO | MH CONN 9:00 OPEN |
| 243.7 | TF | ACTIVE |
| 134.7 | SAP | SEVERE AGG UNDER MAG COAT |
| 154.2 | MGO | MAG COAT FINISH |
| 334.2 | SSS | BLISTERING PEELING CONCRETE |
| 334.2 | MGO | MAG COAT 95% FINISH |
| 154.2 | SAP | SEVERE AGG |