Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 21, 2019, 05:05 PM
  • 18 0438_18 0437_5212019_100729.mp4

Date
05/21/2019
W/O
0767446
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00675
PipeID
P14288
Time
10:05 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Heavy Cleaning
Media Label
G7984
Sewer Name
18 FLORENCE AVENUE TRUNK
City
SANTE FE SPRINGS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
19
Purpose
Maintenance Related
Project
20190521DF_FLORENCE_AVENUE_TRUNK
Material
NRCP
Shape
Circular
Height
18 in.
Upstream MH
18 0438
Downstream MH
18 0437
Dir. of Survey
Downstream
Length Surveyed
90.9 ft.
Total Length
90.9 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
3
Pipe schematic from manhole 18 0438 to 18 0437
MH: 18 0438MH: 18 0437downstream0 ft. AMH - Upstream Manhole, Survey Begins - 10:06 AM0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start13.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"42.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"66.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"88.2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish90.9 ft. AMH - Downstream Manhole, Survey Ends - 10:13 AM90.9 ft. MGO - General Observation - Grease Throughout The Reach (5%)90.9 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active

Observations (11)

DistanceCodeObservation
0AMH10:06 AM
66.5TFC
2SAV
42.4TFC
88.2SAV
13.8TFC
0MWM
0MWL
90.9AMH10:13 AM
90.9MGOGrease Throughout The Reach (5%)
90.9MGOConn. @ Mh, 9 O' Clock. Active

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2019-05-21T10:05:16-07:00
documentation
FRANKLIN, BRAR, CASTILLO
is_lateral_inspection
false