Wastewater/Activity/PacpInspection/1.0May 21, 2019, 04:15 PM
  • 18 0439A_18 0439_5212019_091933.mp4

Date
05/21/2019
W/O
0767446
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00675
PipeID
P14290
Time
9:15 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Heavy Cleaning
Media Label
G7984
Sewer Name
18 FLORENCE AVENUE TRUNK
City
SANTE FE SPRINGS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
19
Purpose
Maintenance Related
Project
20190521DF_FLORENCE_AVENUE_TRUNK
Material
NRCP
Shape
Circular
Height
18 in.
Upstream MH
18 0439A
Downstream MH
18 0439
Dir. of Survey
Downstream
Length Surveyed
196.1 ft.
Total Length
196.1 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
3
Pipe schematic from manhole 18 0439A to 18 0439
MH: 18 0439AMH: 18 0439downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active0 ft. AMH - Upstream Manhole, Survey Begins - 9:17 AM0 ft. MWM - Water Mark, 20 %of cross sectional area2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start23.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"47.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"71.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"94.4 ft. TB - Tap Break-In, at 09 o'clock, -, within 8 inches of joint: YES, 4" - Open96 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 4"120.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"148.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"172.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"193.7 ft. MGO - General Observation - Grease Throughout The Reach (5%)193.7 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish196.1 ft. AMH - Downstream Manhole, Survey Ends - 9:36 AM

Observation photos (1)

  • Tap Break-In, at 09 o'clock, -, within 8 inches of joint: YES, 4" - Open

    94.4 ft. - Tap Break-In, at 09 o'clock, -, within 8 inches of joint: YES, 4" - Open

Observations (16)

DistanceCodeObservation
148.5TFC
0MWL
71.8TFC
0MGOConn. @ Mh, 3 O' Clock. Active
47.7TFC
120.2TFC
96TFC
94.4TBOpen
193.7MGOGrease Throughout The Reach (5%)
196.1AMH9:36 AM
193.7SAV
172.7TFC
23.5TFC
0AMH9:17 AM
2SAV
0MWM

Properties (6)

additional_info
POST CALCIUM INSPECTION ONLY
custom_field_two
3
customer
LACSD
datetime
2019-05-21T09:15:55-07:00
documentation
FRANKLIN, BRAR, CASTILLO
is_lateral_inspection
false