Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 23, 2019, 06:54 PM
  • 30 0236_30 0235_05232019_Manual.mp4

Date
05/23/2019
W/O
0771070
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00884
PipeID
P17937
Time
11:54 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7986
Sewer Name
30 VIA CAMPESINA TRUNK
City
PALOS VERDES ESTATES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 30
Page No.
09
Purpose
Capital Improvement Program Assesment
Project
20190516DF_VIA_CAMPESINA_TRUNK
Material
NRCP
Shape
Circular
Height
10 in.
Upstream MH
30 0236
Downstream MH
30 0235
Dir. of Survey
Downstream
Length Surveyed
179.1 ft.
Total Length
179.1 ft.
Structural Index
3
Structural Quick
3221
Structural Rating
8
O&M Index
1
O&M Quick
1100
O&M Rating
1
Overall Index
2
Overall Quick
Overall Rating
9
Pipe schematic from manhole 30 0236 to 30 0235
MH: 30 0236MH: 30 0235downstream0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 11:55 AM0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. RFJ - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR, Start2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start8.9 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: YES, 4" - Open12.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"29.6 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 4" - Open36.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"60.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"87.1 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"99.7 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: YES, 4"136.8 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 4" - Open155.1 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: YES, 4"176 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish176 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish176 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish176 ft. RFJ - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR, Finish179.1 ft. AMH - Downstream Manhole, Survey Ends - 12:19 PM179.1 ft. MGO - General Observation - Grease Throughout The Reach (5%)

Observation photos (2)

  • Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR, Start

    2 ft. - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (22)

DistanceCodeObservation
2CM
179.1AMH12:19 PM
176CM
2SSS
176SSS
179.1MGOGrease Throughout The Reach (5%)
176SAV
0MWM
29.6TBOpen
87.1TBA
136.8TBOpen
36.5TFC
12.7TFC
60.1TFC
99.7TFC
8.9TFOpen
2RFJ
0AMH11:55 AM
2SAV
155.1TFC
0MWL
176RFJ

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2019-05-23T11:54:11-07:00
documentation
FRANKLIN, CASTILLO
is_lateral_inspection
false