Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 23, 2019, 06:21 PM
  • 30 0237_30 0236_5232019_112441.mp4

Date
05/23/2019
W/O
0771070
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00884
PipeID
P17938
Time
11:21 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7986
Sewer Name
30 VIA CAMPESINA TRUNK
City
PALOS VERDES ESTATES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 30
Page No.
09
Purpose
Capital Improvement Program Assesment
Project
20190516DF_VIA_CAMPESINA_TRUNK
Material
NRCP
Shape
Circular
Height
10 in.
Upstream MH
30 0237
Downstream MH
30 0236
Dir. of Survey
Downstream
Length Surveyed
229.2 ft.
Total Length
229.2 ft.
Structural Index
3
Structural Quick
3222
Structural Rating
10
O&M Index
2
O&M Quick
2111
O&M Rating
3
Overall Index
2
Overall Quick
Overall Rating
13
Pipe schematic from manhole 30 0237 to 30 0236
MH: 30 0237MH: 30 0236downstream0 ft. MGO - General Observation - Conn. @ Mh, 6 O' Clock. Active0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 11:23 AM0 ft. MWM - Water Mark, 15 %of cross sectional area2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. RFJ - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR, Start24.2 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: YES, 4"71.7 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: YES, 4"91.6 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: YES, 4" - Open119.2 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: YES, 4"178.6 ft. TFD - Tap Factory Made Defective, at 03 o'clock, -, within 8 inches of joint: YES, 4" - 15% ROOTS/LATERAL180 ft. MWLS - Water Level, Sag in pipe, 10 %of cross sectional area, Start190.3 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: YES, 4"215.2 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: YES, 4" - Open227 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish227 ft. RFJ - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR, Finish227 ft. MWLS - Water Level, Sag in pipe, 10 %of cross sectional area, Finish227 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish227 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish229.2 ft. MGO - General Observation - Grease Throughout The Reach (5%)229.2 ft. AMH - Downstream Manhole, Survey Ends - 11:53 AM

Observation photos (3)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR, Start

    2 ft. - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR, Start

  • Tap Factory Made Defective, at 03 o'clock, -, within 8 inches of joint: YES, 4" - 15% ROOTS/LATERAL

    178.6 ft. - Tap Factory Made Defective, at 03 o'clock, -, within 8 inches of joint: YES, 4" - 15% ROOTS/LATERAL

Observations (23)

DistanceCodeObservation
0MGOConn. @ Mh, 6 O' Clock. Active
227CM
71.7TFC
91.6TFOpen
227RFJ
178.6TFD15% ROOTS/LATERAL
227MWLS
2CM
24.2TFC
215.2TFOpen
229.2MGOGrease Throughout The Reach (5%)
0MWL
2SSS
180MWLS
2SAV
0AMH11:23 AM
119.2TFC
227SAV
0MWM
190.3TFC
227SSS
2RFJ
229.2AMH11:53 AM

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2019-05-23T11:21:26-07:00
documentation
FRANKLIN, CASTILLO
is_lateral_inspection
false