Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 23, 2019, 04:59 PM
  • 30 0238_30 0237_5232019_102733.mp4

Date
05/23/2019
W/O
0771070
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00884
PipeID
P17939
Time
9:59 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7986
Sewer Name
30 VIA CAMPESINA TRUNK
City
PALOS VERDES ESTATES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 30
Page No.
09
Purpose
Capital Improvement Program Assesment
Project
20190516DF_VIA_CAMPESINA_TRUNK
Material
NRCP
Shape
Circular
Height
10 in.
Upstream MH
30 0238
Downstream MH
30 0237
Dir. of Survey
Downstream
Length Surveyed
167 ft.
Total Length
167 ft.
Structural Index
3
Structural Quick
3221
Structural Rating
8
O&M Index
2
O&M Quick
2111
O&M Rating
3
Overall Index
2
Overall Quick
Overall Rating
11
Pipe schematic from manhole 30 0238 to 30 0237
MH: 30 0238MH: 30 0237downstream0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 10:24 AM0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active2 ft. RFJ - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR, Start2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start4 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: YES, 4" - OPEN43.4 ft. MGP - General Photograph48.2 ft. TFA - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: YES, 4"99.6 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: YES, 4" - Open111.5 ft. MGP - General Photograph115.3 ft. TFD - Tap Factory Made Defective, at 09 o'clock, -, within 8 inches of joint: YES, 4" - Unkown/90% ROOTS/LATERAL151.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4" - Open165 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish165 ft. RFJ - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR, Finish165 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish165 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish166 ft. MGO - General Observation - Conn. @ Mh, 7 O' Clock. Active166.9 ft. MGO - General Observation - GREASE THROUGHOUT THE REACH (5%)167 ft. AMH - Downstream Manhole, Survey Ends - 10:50 AM

Observation photos (7)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR, Start

    2 ft. - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Photograph

    43.4 ft. - General Photograph

  • General Photograph

    111.5 ft. - General Photograph

  • Tap Factory Made Defective, at 09 o'clock, -, within 8 inches of joint: YES, 4" - Unkown/90% ROOTS/LATERAL

    115.3 ft. - Tap Factory Made Defective, at 09 o'clock, -, within 8 inches of joint: YES, 4" - Unkown/90% ROOTS/LATERAL

Observations (22)

DistanceCodeObservation
111.5MGP
2CM
2SSS
165SAV
0MWM
166.9MGOGREASE THROUGHOUT THE REACH (5%)
2MGOConn. @ Mh, 9 O' Clock. Active
2RFJ
165RFJ
166MGOConn. @ Mh, 7 O' Clock. Active
0AMH10:24 AM
115.3TFDUnkown/90% ROOTS/LATERAL
2SAV
4TFOPEN
165SSS
165CM
167AMH10:50 AM
99.6TFOpen
151.8TFOpen
48.2TFA
0MWL
43.4MGP

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2019-05-23T09:59:55-07:00
documentation
FRANKLIN, CASTILLO, BRAR
is_lateral_inspection
false