Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 23, 2019, 04:11 PM
  • 30 0239_30 0238_5232019_091559.mp4

Date
05/23/2019
W/O
0771070
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00884
PipeID
P17940
Time
9:11 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7986
Sewer Name
30 VIA CAMPESINA TRUNK
City
PALOS VERDES ESTATES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 30
Page No.
09
Purpose
Capital Improvement Program Assesment
Project
20190516DF_VIA_CAMPESINA_TRUNK
Material
NRCP
Shape
Circular
Height
10 in.
Upstream MH
30 0239
Downstream MH
30 0238
Dir. of Survey
Downstream
Length Surveyed
241.7 ft.
Total Length
241.7 ft.
Structural Index
3
Structural Quick
3221
Structural Rating
8
O&M Index
1
O&M Quick
2112
O&M Rating
4
Overall Index
2
Overall Quick
Overall Rating
12
Pipe schematic from manhole 30 0239 to 30 0238
MH: 30 0239MH: 30 0238downstream0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 9:13 AM2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start10.6 ft. RFJ - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR, Start16.2 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: YES, 4"50.9 ft. RFJ - Roots Fine Joint, at 03 o'clock, within 8 inches of joint: YESR60.5 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: YES, 4"72.4 ft. TFD - Tap Factory Made Defective, at 09 o'clock, -, within 8 inches of joint: YES, 4" - 100% ROOTS/LATERAL128.7 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: YES, 4"130.5 ft. TBA - Tap Break-In Active, at 09 o'clock, -, within 8 inches of joint: YES, 4", 4" - Active187.7 ft. MGP - General Photograph236.2 ft. MGP - General Photograph240.1 ft. RFJ - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR, Finish240.1 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish240.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish240.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish241.7 ft. MGO - General Observation - GREASE THROUGHOUT THE REACH (5%)241.7 ft. AMH - Downstream Manhole, Survey Ends - 9:57 AM241.7 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active/DEFECTIVE

Observation photos (9)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    6 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR, Start

    10.6 ft. - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR, Start

  • Roots Fine Joint, at 03 o'clock, within 8 inches of joint: YESR

    50.9 ft. - Roots Fine Joint, at 03 o'clock, within 8 inches of joint: YESR

  • Tap Factory Made Defective, at 09 o'clock, -, within 8 inches of joint: YES, 4" - 100% ROOTS/LATERAL

    72.4 ft. - Tap Factory Made Defective, at 09 o'clock, -, within 8 inches of joint: YES, 4" - 100% ROOTS/LATERAL

  • General Photograph

    187.7 ft. - General Photograph

  • General Photograph

    236.2 ft. - General Photograph

  • General Observation - Conn. @ Mh, 9 O' Clock. Active/DEFECTIVE

    241.7 ft. - General Observation - Conn. @ Mh, 9 O' Clock. Active/DEFECTIVE

Observations (22)

DistanceCodeObservation
240.1RFJ
2SSS
0MWM
187.7MGP
6CM
130.5TBAActive
60.5TFC
241.7MGOGREASE THROUGHOUT THE REACH (5%)
128.7TFC
72.4TFD100% ROOTS/LATERAL
0MWL
241.7AMH9:57 AM
240.1CM
241.7MGOConn. @ Mh, 9 O' Clock. Active/DEFECTIVE
240.1SSS
10.6RFJ
236.2MGP
0AMH9:13 AM
2SAV
50.9RFJ
16.2TFC
240.1SAV

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2019-05-23T09:11:45-07:00
documentation
FRANKLIN, CASTILLO, BRAR
is_lateral_inspection
false