30 0239_30 0238_5232019_091559.mp4
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
6 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
10.6 ft. - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR, Start
50.9 ft. - Roots Fine Joint, at 03 o'clock, within 8 inches of joint: YESR
72.4 ft. - Tap Factory Made Defective, at 09 o'clock, -, within 8 inches of joint: YES, 4" - 100% ROOTS/LATERAL
187.7 ft. - General Photograph
236.2 ft. - General Photograph
241.7 ft. - General Observation - Conn. @ Mh, 9 O' Clock. Active/DEFECTIVE
| Distance | Code | Observation |
|---|---|---|
| 240.1 | RFJ | — |
| 2 | SSS | — |
| 0 | MWM | — |
| 187.7 | MGP | — |
| 6 | CM | — |
| 130.5 | TBA | Active |
| 60.5 | TFC | — |
| 241.7 | MGO | GREASE THROUGHOUT THE REACH (5%) |
| 128.7 | TFC | — |
| 72.4 | TFD | 100% ROOTS/LATERAL |
| 0 | MWL | — |
| 241.7 | AMH | 9:57 AM |
| 240.1 | CM | — |
| 241.7 | MGO | Conn. @ Mh, 9 O' Clock. Active/DEFECTIVE |
| 240.1 | SSS | — |
| 10.6 | RFJ | — |
| 236.2 | MGP | — |
| 0 | AMH | 9:13 AM |
| 2 | SAV | — |
| 50.9 | RFJ | — |
| 16.2 | TFC | — |
| 240.1 | SAV | — |