Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 16, 2019, 06:04 PM
  • 30 0251_30 0250_5162019_110745.mp4

Date
05/16/2019
W/O
0771071
Weather
Damp
Operator/Surveyor
FRANKLIN
Sewer ID
Z00884
PipeID
P17952
Time
11:04 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7981
Sewer Name
30 VIA CAMPESINA TRUNK
City
PALOS VERDES ESTATES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 30
Page No.
09
Purpose
Routine Assessment
Project
20190516DF_VIA_CAMPESINA_TRUNK
Material
NRCP
Shape
Circular
Height
10 in.
Upstream MH
30 0251
Downstream MH
30 0250
Dir. of Survey
Downstream
Length Surveyed
264.1 ft.
Total Length
264.1 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
1
O&M Quick
1100
O&M Rating
1
Overall Index
2
Overall Quick
Overall Rating
6
Pipe schematic from manhole 30 0251 to 30 0250
MH: 30 0251MH: 30 0250downstream0 ft. AMH - Upstream Manhole, Survey Begins - 11:06 AM0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 15 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. RFJ - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR, Start40.8 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: YES, 4"121.3 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: YES, 4" - Open/40% GREASE-LATERAL219.5 ft. TB - Tap Break-In, at 09 o'clock, -, within 8 inches of joint: YES, 4" - Open250 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: YES, 4"260.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish260.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish260.1 ft. RFJ - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR, Finish261 ft. MGP - General Photograph261 ft. MGP - General Photograph261 ft. MGP - General Photograph261.5 ft. MGP - General Photograph264.1 ft. MGO - General Observation - Grease Throughout The Reach (5%)264.1 ft. AMH - Downstream Manhole, Survey Ends - 11:35 AM

Observation photos (7)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR, Start

    2 ft. - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR, Start

  • Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: YES, 4" - Open/40% GREASE-LATERAL

    121.3 ft. - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: YES, 4" - Open/40% GREASE-LATERAL

  • General Photograph

    261 ft. - General Photograph

  • General Photograph

    261 ft. - General Photograph

  • General Photograph

    261 ft. - General Photograph

  • General Photograph

    261.5 ft. - General Photograph

Observations (19)

DistanceCodeObservation
121.3TFOpen/40% GREASE-LATERAL
260.1SAV
0AMH11:06 AM
0MWL
264.1MGOGrease Throughout The Reach (5%)
261MGP
219.5TBOpen
261MGP
40.8TFC
264.1AMH11:35 AM
0MWM
2SSS
261.5MGP
260.1SSS
260.1RFJ
261MGP
250TFC
2SAV
2RFJ

Properties (6)

custom_field_three
SHELF DETERIORATING
custom_field_two
3
customer
LACSD
datetime
2019-05-16T11:04:40-07:00
documentation
FRANKLIN, CASTILLO, BRAR
is_lateral_inspection
false