Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 16, 2019, 05:09 PM
  • 30 0252_30 0251_5162019_105126.mp4

Date
05/16/2019
W/O
0771071
Weather
Light Rain
Operator/Surveyor
FRANKLIN
Sewer ID
Z00884
PipeID
P17953
Time
10:09 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7981
Sewer Name
30 VIA CAMPESINA TRUNK
City
PALOS VERDES ESTATES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 30
Page No.
09
Purpose
Routine Assessment
Project
20190516DF_VIA_CAMPESINA_TRUNK
Material
NRCP
Shape
Circular
Height
10 in.
Upstream MH
30 0252
Downstream MH
30 0251
Dir. of Survey
Downstream
Length Surveyed
106.7 ft.
Total Length
106.7 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
1
O&M Quick
1100
O&M Rating
1
Overall Index
2
Overall Quick
Overall Rating
6
Pipe schematic from manhole 30 0252 to 30 0251
MH: 30 0252MH: 30 0251downstream0 ft. AMH - Upstream Manhole, Survey Begins - 10:12 AM0.1 ft. MWL - Water Level, 10 %of cross sectional area0.1 ft. MWM - Water Mark, 15 %of cross sectional area1.9 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start5.1 ft. RFJ - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR, Start52.6 ft. MGP - General Photograph104.6 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish104.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish104.6 ft. RFJ - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR, Finish106.7 ft. AMH - Downstream Manhole, Survey Ends - 11:03 AM106.7 ft. MGO - General Observation - Grease Throughout The Reach (5%)

Observation photos (5)

  • Water Level, 10 %of cross sectional area

    0.1 ft. - Water Level, 10 %of cross sectional area

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    1.9 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR, Start

    5.1 ft. - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR, Start

  • General Photograph

    52.6 ft. - General Photograph

Observations (13)

DistanceCodeObservation
106.7AMH11:03 AM
0.1MWL
52.6MGP
5.1RFJ
2MGOConn. @ Mh, 9 O' Clock. Active
0AMH10:12 AM
2SSS
0.1MWM
106.7MGOGrease Throughout The Reach (5%)
104.6SAV
104.6SSS
104.6RFJ
1.9SAV

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2019-05-16T10:09:17-07:00
documentation
FRANKLIN, CASTILLO, BRAR
is_lateral_inspection
false