Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 1, 2019, 09:22 AM
  • 22 1143_22 1142A _02012019_013331.mp4

Date
02/01/2019
W/O
745456
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00807
PipeID
P17522
Time
1:22 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6379
Sewer Name
22 DUARTE TRUNK
City
DUARTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
02
Purpose
Routine Assessment
Project
WO_745456_TV22035_JAN2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
22 1142A
Downstream MH
22 1143
Dir. of Survey
Upstream
Length Surveyed
276.5 ft.
Total Length
276.5 ft.
Structural Index
3
Structural Quick
3J00
Structural Rating
165
O&M Index
2
O&M Quick
2J00
O&M Rating
110
Overall Index
3
Overall Quick
Overall Rating
275
Pipe schematic from manhole 22 1142A to 22 1143
MH: 22 1142AMH: 22 1143upstream0 ft. AMH - Upstream Manhole, Survey Ends - 22 11431.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish1.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish9.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"60.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"87.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"109.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"158 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"175.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"200.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"257.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"260.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"274.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start274.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start276.5 ft. MWL - Water Level, 5 %of cross sectional area276.5 ft. AMH - Downstream Manhole, Survey Begins - 22 1142A276.5 ft. MWM - Water Mark, 20 %of cross sectional area

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
118.5TFC
0MWL
76.3TFC
16.1TFC
2.1SAP
216.1TFC
0AMH22 1142A
0MWM
276.5AMH22 1143
267.4TFC
2DAGS
100.9TF
19.4TF
189TFC
274.9SAP
167.4TFC
274.9DAGS

Properties (5)

additional_info
SC365691
custom_field_two
2
customer
LACSD
datetime
2019-02-01T01:22:18-08:00
is_lateral_inspection
false