Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 19, 2018, 09:18 AM
  • 05 0137_05 0136 _12192018_012951.mp4

Date
12/19/2018
W/O
740131
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00431
PipeID
P05428
Time
1:18 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6252
Sewer Name
05 DISTRICT #5 MAIN TRUNK
City
HAWTHRONE
Loc. details
Alley
Location Code
H
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
13
Purpose
Routine Assessment
Project
RFIR_WO_740015_TV05147_DEC2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Width
33 in.
Upstream MH
05 0136
Downstream MH
05 0137
Dir. of Survey
Upstream
Length Surveyed
328.7 ft.
Total Length
328.7 ft.
Structural Index
3
Structural Quick
513L
Structural Rating
208
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
208
Pipe schematic from manhole 05 0136 to 05 0137
MH: 05 0136MH: 05 0137upstream0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Ends - 05 01370.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish6.2 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES33.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start317.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start323.5 ft. MGO - General Observation - MAG COAT328.7 ft. AMH - Downstream Manhole, Survey Begins - 05 0136328.7 ft. MWM - Water Mark, 10 %of cross sectional area328.7 ft. MWL - Water Level, 5 %of cross sectional area328.7 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    11.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    294.9 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES

    322.5 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES

Observations (12)

DistanceCodeObservation
328.5SAP
294.9SSS
0AMH05 0136
328.6SSS
11.1SAP
0MWM
0MWL
328.7MGOCONNECTION AT MH 3 O'CLOCK
328.7AMH05 0137
322.5SRV
5.2MGOMAG COAT
0MGOCONNECTION AT MH 3 O'CLOCK

Properties (5)

additional_info
SC365485
custom_field_two
2
customer
LACSD
datetime
2018-12-19T01:18:39-08:00
is_lateral_inspection
false