Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 11, 2019, 08:52 AM
  • 02 1086_02 1085 _01112019_010559.mp4

Date
01/11/2019
W/O
745348
Weather
Dry
Operator/Surveyor
E.RUIZ
Sewer ID
Z00282
PipeID
P03660
Time
12:52 AM
Certificate
U-715-07000753
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K5340
Sewer Name
02 MONTEBELLO DIVERSION TRUNK
City
MONTEBELLO
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
18
Purpose
Routine Assessment
Project
RFIR_WO_745348_TV02212_JAN2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
02 1086
Downstream MH
02 1085
Dir. of Survey
Downstream
Length Surveyed
313.9 ft.
Total Length
313.9 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
3
Pipe schematic from manhole 02 1086 to 02 1085
MH: 02 1086MH: 02 1085downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. AMH - Downstream Manhole, Survey Begins - 02 10856 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start6 ft. MGO - General Observation - MAGNEZIUM H.O COATING start35.9 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES, 8"86.4 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 8"143.3 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 8"190.5 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: YES, 8"239.7 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 8"288.6 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 8"310.8 ft. MGO - General Observation - MAGNEZIUM H.O COATING finish310.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish313.9 ft. AMH - Upstream Manhole, Survey Ends - 02 1086

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    6 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAGNEZIUM H.O COATING start

    6 ft. - General Observation - MAGNEZIUM H.O COATING start

  • Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: YES, 8"

    190.5 ft. - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: YES, 8"

Observations (14)

DistanceCodeObservation
0MWL
310.8MGOMAGNEZIUM H.O COATING finish
0MWM
35.9TFA
313.9AMH02 1086
6SAP
288.6TFC
6MGOMAGNEZIUM H.O COATING start
86.4TFC
190.5TBA
239.7TFC
143.3TFC
0AMH02 1085
310.8SAP

Properties (4)

custom_field_two
2
customer
LACSD
datetime
2019-01-11T00:52:51-08:00
is_lateral_inspection
false