Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 11, 2019, 09:34 AM
  • 02 1085_02 1084 _01112019_015010.mp4

Date
01/11/2019
W/O
745348
Weather
Dry
Operator/Surveyor
E.RUIZ
Sewer ID
Z00282
PipeID
P03659
Time
1:34 AM
Certificate
U-715-07000753
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K5340
Sewer Name
02 MONTEBELLO DIVERSION TRUNK
City
MOTEBELLO
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
18
Purpose
Routine Assessment
Project
RFIR_WO_745348_TV02212_JAN2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
02 1085
Downstream MH
02 1084
Dir. of Survey
Downstream
Length Surveyed
338.8 ft.
Total Length
338.8 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
3
Pipe schematic from manhole 02 1085 to 02 1084
MH: 02 1085MH: 02 1084downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 10856 ft. MGO - General Observation - MAGNEZIUM H.O COATING start6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start12.6 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 8"61.7 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 8"111.8 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 8"159.5 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 8"207.7 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 8"265.4 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 8"313.7 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 8"334.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish334.7 ft. MGO - General Observation - MAGNEZIUM H.O COATING finish338.8 ft. AMH - Downstream Manhole, Survey Ends - 02 1084

Observation photos (2)

  • General Observation - MAGNEZIUM H.O COATING start

    6 ft. - General Observation - MAGNEZIUM H.O COATING start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    6 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (15)

DistanceCodeObservation
61.7TFC
207.7TFC
111.8TFC
334.7MGOMAGNEZIUM H.O COATING finish
6MGOMAGNEZIUM H.O COATING start
313.7TFC
159.5TFC
265.4TFC
0MWM
12.6TFC
6SAP
0MWL
334.6SAP
0AMH02 1085
338.8AMH02 1084

Properties (4)

custom_field_two
2
customer
LACSD
datetime
2019-01-11T01:34:40-08:00
is_lateral_inspection
false