Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 11, 2019, 09:51 AM
  • 02 1084_02 1083 _01112019_020701.mp4

Date
01/11/2019
W/O
745348
Weather
Dry
Operator/Surveyor
E.RUIZ
Sewer ID
Z00282
PipeID
P03658
Time
1:51 AM
Certificate
U-715-07000753
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K5340
Sewer Name
02 MONTEBELLO DIVERSION TRUNK
City
MOTEBELLO
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
18
Purpose
Routine Assessment
Project
RFIR_WO_745348_TV02212_JAN2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
02 1084
Downstream MH
02 1083
Dir. of Survey
Downstream
Length Surveyed
334 ft.
Total Length
334 ft.
Structural Index
4
Structural Quick
5131
Structural Rating
8
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
10
Pipe schematic from manhole 02 1084 to 02 1083
MH: 02 1084MH: 02 1083downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 10840 ft. MWL - Water Level, 10 %of cross sectional area3 ft. MGO - General Observation - MAGNEZIUM H.O COATING start3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start27.2 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 8"76.6 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 8"125.2 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 8"128.6 ft. OBM - Obstacles Pipe Material, 10 %of cross sectional area, from 06 to 08 o'clock173.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"246.8 ft. SRV - Surface Reinforcement Visible, at 10 o'clock, within 8 inches of joint: YES270.5 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES, 8"319.6 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: YES, 8"330.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish330.9 ft. MGO - General Observation - MAGNEZIUM H.O COATING finish334 ft. MGO - General Observation - SERVICE CONNECTION AT 3 O' CLOCK AT MH334 ft. AMH - Downstream Manhole, Survey Ends - 02 1083

Observation photos (4)

  • General Observation - MAGNEZIUM H.O COATING start

    3 ft. - General Observation - MAGNEZIUM H.O COATING start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Obstacles Pipe Material, 10 %of cross sectional area, from 06 to 08 o'clock

    128.6 ft. - Obstacles Pipe Material, 10 %of cross sectional area, from 06 to 08 o'clock

  • Surface Reinforcement Visible, at 10 o'clock, within 8 inches of joint: YES

    246.8 ft. - Surface Reinforcement Visible, at 10 o'clock, within 8 inches of joint: YES

Observations (17)

DistanceCodeObservation
173.8TFC
319.6TBA
330.9SAP
334MGOSERVICE CONNECTION AT 3 O' CLOCK AT MH
270.5TFA
3MGOMAGNEZIUM H.O COATING start
3SAP
334AMH02 1083
330.9MGOMAGNEZIUM H.O COATING finish
128.6OBM
246.8SRV
27.2TFC
0MWM
125.2TF
0AMH02 1084
0MWL
76.6TFC

Properties (4)

custom_field_two
2
customer
LACSD
datetime
2019-01-11T01:51:11-08:00
is_lateral_inspection
false