Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 11, 2019, 09:29 AM
  • B 0413_B 0412 _01112019_014146.mp4

Date
01/11/2019
W/O
740017
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00092
PipeID
P08925
Time
1:29 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6302
Sewer Name
B JOINT OUTFALL B - UNIT 5B
City
PASADENA
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
03
Purpose
Routine Assessment
Project
RFIR_WO_740017_TV15187_DEC2018
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
B 0413
Downstream MH
B 0412
Dir. of Survey
Downstream
Length Surveyed
377.5 ft.
Total Length
377.5 ft.
Structural Index
3
Structural Quick
3M00
Structural Rating
216
O&M Index
2
O&M Quick
2N00
O&M Rating
150
Overall Index
2
Overall Quick
Overall Rating
366
Pipe schematic from manhole B 0413 to B 0412
MH: B 0413MH: B 0412downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 04132 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start13.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start75 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"145.3 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"164.1 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"239.6 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"331.1 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"375.7 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish375.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish377.5 ft. AMH - Downstream Manhole, Survey Ends - B 0412

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    13.6 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
145.3TFA
0MWL
2DAGS
239.6TFA
375.7CM
0MWM
75TFA
377.5AMHB 0412
375.7DAGS
0AMHB 0413
331.1TFA
13.6CM
164.1TBA

Properties (5)

additional_info
SC365668
custom_field_two
3
customer
LACSD
datetime
2019-01-11T01:29:44-08:00
is_lateral_inspection
false