Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 2, 2019, 11:17 AM
  • B 0411_B 0410 _01022019_033113.mp4

Date
01/02/2019
W/O
740017
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00092
PipeID
P08923
Time
3:17 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6287
Sewer Name
B JOINT OUTFALL B - UNIT 5B
City
PASADENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
03
Purpose
Routine Assessment
Project
RFIR_WO_740017_TV15187_DEC2018
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
B 0411
Downstream MH
B 0410
Dir. of Survey
Downstream
Length Surveyed
396.5 ft.
Total Length
396.5 ft.
Structural Index
3
Structural Quick
3N00
Structural Rating
222
O&M Index
2
O&M Quick
412O
O&M Rating
160
Overall Index
3
Overall Quick
Overall Rating
382
Pipe schematic from manhole B 0411 to B 0410
MH: B 0411MH: B 0410downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 04112 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start23.7 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start94 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"172.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"202.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"311.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"316.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"394.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish394.1 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish396.5 ft. MGO - General Observation - COCKROACHES IN MANHOLE396.5 ft. AMH - Downstream Manhole, Survey Ends - B 0410

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    23.7 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    396.5 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (14)

DistanceCodeObservation
394.1DAGS
311.2TFC
172.9TFC
23.7CM
396.5MGOCOCKROACHES IN MANHOLE
316.7TFC
0MWL
202.2TFA
2DAGS
396.5AMHB 0410
0MWM
94TFC
394.1CM
0AMHB 0411

Properties (5)

additional_info
SC365653
custom_field_two
3
customer
LACSD
datetime
2019-01-02T03:17:11-08:00
is_lateral_inspection
false