Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 12, 2019, 06:29 AM
  • J 0053_J 0052_02112019_224825.mp4

Date
02/11/2019
W/O
745313
Weather
Dry
Operator/Surveyor
E.RUIZ
Sewer ID
Z00062
PipeID
P11630
Time
10:29 PM
Certificate
U-715-07000753
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6270
Sewer Name
J JOINT OUTFALL J - UNIT 2C
City
LOMITA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
32
Purpose
Routine Assessment
Project
RFIR_WO_745313_TV05287_JAN2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
42 in.
Width
42 in.
Upstream MH
J 0053
Downstream MH
J 0052
Dir. of Survey
Downstream
Length Surveyed
335.9 ft.
Total Length
335.9 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
4
Overall Quick
Overall Rating
7
Pipe schematic from manhole J 0053 to J 0052
MH: J 0053MH: J 0052downstream0 ft. AMH - Upstream Manhole, Survey Begins - J 00530 ft. MWM - Water Mark, 55 %of cross sectional area0 ft. MWL - Water Level, 55 %of cross sectional area11.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start11.9 ft. MGO - General Observation - MAG COAT145.1 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES, 8"335.5 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish335.9 ft. AMH - Downstream Manhole, Survey Ends - J 0052

Observation photos (2)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    11.9 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    11.9 ft. - General Observation - MAG COAT

Observations (8)

DistanceCodeObservation
335.9AMHJ 0052
145.1TFA
11.9SAP
0AMHJ 0053
11.9MGOMAG COAT
0MWM
0MWL
335.5SAP

Properties (4)

custom_field_two
2
customer
LACSD
datetime
2019-02-11T22:29:30-08:00
is_lateral_inspection
false