Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 16, 2019, 10:38 AM
  • 18 0436_18 0435_5162019_034019.mp4

Date
05/16/2019
W/O
0767446
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00675
PipeID
P14286
Time
3:38 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1212
Sewer Name
18 FLORENCE AVENUE TRUNK
City
SANTA FE SPRINGS
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
19
Purpose
Routine Assessment
Project
20190515MDM_FLORENCE_AVENUE_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
21 in.
Upstream MH
18 0436
Downstream MH
18 0435
Dir. of Survey
Downstream
Length Surveyed
402.9 ft.
Total Length
402.9 ft.
Structural Index
2
Structural Quick
2300
Structural Rating
6
O&M Index
2
O&M Quick
2600
O&M Rating
12
Overall Index
2
Overall Quick
Overall Rating
18
Pipe schematic from manhole 18 0436 to 18 0435
MH: 18 0436MH: 18 0435downstream0 ft. AMH - Upstream Manhole, Survey Begins - 4:05AMAM0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area2 ft. MMC - Material Change, Other (state in comments) - PIPE IS LINED -PEELING COATING ON LINER2 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - GREASE SLUDGE8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6", 6" - Capped18 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - DEBRIE24.6 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - ROCKS27.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped30.4 ft. MWL - Water Level, 5 %of cross sectional area52.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped67.9 ft. MGP - General Photograph - GREASE OR SCALE67.9 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - GREASE OR SCALE71.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6", 6" - Capped79.1 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish - GREASE OR SCALE79.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING COATING100 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open100 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - R0CKS DEBRIE119.9 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish - ROCKS DEBRIE123.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped140.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING OLG COATING152.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped181.3 ft. DAZ - Deposits Attached Other, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - GREASE OR COATING181.3 ft. MGO - General Observation - LINED PIPE WITH FAKING OLD COATING200.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6", 6" - Capped220.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING COATING ON LINED PIPE224.6 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: NO, 6", 6" - Open253.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6", 6" - Capped276.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6", 6" - Capped297.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6", 6" - Open329 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6", 6" - Capped353.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6", 6" - Capped377.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6", 6" - Capped402.5 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active402.5 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish - DEBRIE402.5 ft. DAZ - Deposits Attached Other, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish - GREASE OR SCALE402.9 ft. AMH - Downstream Manhole, Survey Ends - 4:50AM

Observation photos (11)

  • Material Change, Other (state in comments) - PIPE IS LINED -PEELING COATING ON LINER

    2 ft. - Material Change, Other (state in comments) - PIPE IS LINED -PEELING COATING ON LINER

  • Deposits Settled Other,  5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start - GREASE SLUDGE

    2 ft. - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - GREASE SLUDGE

  • Deposits Settled Other,  10 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES - DEBRIE

    18 ft. - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - DEBRIE

  • Deposits Settled Other,  10 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES - ROCKS

    24.6 ft. - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - ROCKS

  • General Photograph - GREASE OR SCALE

    67.9 ft. - General Photograph - GREASE OR SCALE

  • Deposits Settled Other,  10 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start - GREASE OR SCALE

    67.9 ft. - Deposits Settled Other, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - GREASE OR SCALE

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO -  PEELING COATING

    79.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING COATING

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO -  PEELING OLG COATING

    140.4 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING OLG COATING

  • Deposits Attached Other, 10 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start - GREASE OR COATING

    181.3 ft. - Deposits Attached Other, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - GREASE OR COATING

  • General Observation - LINED PIPE WITH FAKING OLD COATING

    181.3 ft. - General Observation - LINED PIPE WITH FAKING OLD COATING

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING COATING ON LINED PIPE

    220.2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING COATING ON LINED PIPE

Observations (37)

DistanceCodeObservation
0AMH4:05AMAM
24.6DSZROCKS
100TFOpen
2MMCPIPE IS LINED -PEELING COATING ON LINER
220.2SSSPEELING COATING ON LINED PIPE
119.9DSZROCKS DEBRIE
402.5MGOConn. @ Mh, 9 O' Clock. Active
224.6TFOpen
181.3DAZGREASE OR COATING
0MWL
402.5DSZDEBRIE
67.9MGPGREASE OR SCALE
79.1DSZGREASE OR SCALE
71.1TFCCapped
402.5DAZGREASE OR SCALE
2DSZGREASE SLUDGE
297.1TFOpen
276.7TFCCapped
353.1TFCCapped
30.4MWL
52.2TFCCapped
140.4SSSPEELING OLG COATING
402.9AMH4:50AM
79.1SSSPEELING COATING
0MWM
27.4TFCCapped
18DSZDEBRIE
8TFCCapped
67.9DSZGREASE OR SCALE
123.8TFCCapped
377.2TFCCapped
329TFCCapped
181.3MGOLINED PIPE WITH FAKING OLD COATING
100DSZR0CKS DEBRIE
152.7TFCCapped
200.5TFCCapped
253.3TFCCapped

Properties (6)

custom_field_three
LINED PIPE GOOD CONDITION
custom_field_two
4
customer
LACSD
datetime
2019-05-16T03:38:30-07:00
documentation
MARTIN,REVELES,RUVALCABA
is_lateral_inspection
false