Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 15, 2019, 11:32 AM
  • 18 0437_18 0436_5152019_043908.mp4

Date
05/15/2019
W/O
0767446
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00675
PipeID
P14287
Time
4:32 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Heavy Cleaning
Media Label
H1212
Sewer Name
18 FLORENCE AVENUE TRUNK
City
SANTA FE SPRINGS
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
19
Purpose
Routine Assessment
Project
20190515MDM_FLORENCE_AVENUE_TRUNK
Material
NRCP
Shape
Circular
Height
18 in.
Upstream MH
18 0437
Downstream MH
18 0436
Dir. of Survey
Downstream
Length Surveyed
400.9 ft.
Total Length
400.9 ft.
Structural Index
3
Structural Quick
4221
Structural Rating
10
O&M Index
3
O&M Quick
3422
O&M Rating
16
Overall Index
3
Overall Quick
Overall Rating
26
Pipe schematic from manhole 18 0437 to 18 0436
MH: 18 0437MH: 18 0436downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 4:40AM0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active2 ft. DSGV - Deposits Settled Gravel, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIE2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTACHED2 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG6.8 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - DEBRIE6.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped23 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped38.9 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish - DEBRIE ROCKS SLUDGE45.1 ft. MGO - General Observation - 60% MAG COAT START45.1 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish45.1 ft. DAGS - Deposits Attached Grease, 20 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start51.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped63.5 ft. MGO - General Observation - 90% MAG COAT START124.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped126.6 ft. DAGS - Deposits Attached Grease, 20 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish126.6 ft. DAGS - Deposits Attached Grease, 15 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start152.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped176 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped194.8 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG200 ft. DAGS - Deposits Attached Grease, 15 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish200 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped200 ft. DAGS - Deposits Attached Grease, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start228.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped252.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped276.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped300.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open324.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Active352.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped372.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped400.5 ft. DAGS - Deposits Attached Grease, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish - GREASE OR SCALE400.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - PEELING CONCRETE SEVERE AGG ATTACHED400.5 ft. DSGV - Deposits Settled Gravel, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish - ROCKS SLUDGE DEBRIE400.5 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG400.5 ft. MGO - General Observation - 90% MAG COAT FINISH400.9 ft. AMH - Downstream Manhole, Survey Ends - 5:30AM

Observation photos (11)

  • Deposits Settled Gravel,  5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start - DEBRIE

    2 ft. - Deposits Settled Gravel, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIE

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTACHED

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTACHED

  • Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Deposits Settled Other,  15 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start - DEBRIE

    6.8 ft. - Deposits Settled Other, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - DEBRIE

  • General Observation - 60% MAG COAT START

    45.1 ft. - General Observation - 60% MAG COAT START

  • Deposits Attached Grease, 20 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    45.1 ft. - Deposits Attached Grease, 20 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - 90% MAG COAT START

    63.5 ft. - General Observation - 90% MAG COAT START

  • Deposits Attached Grease, 15 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    126.6 ft. - Deposits Attached Grease, 15 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG

    194.8 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • Deposits Attached Grease, 20 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    200 ft. - Deposits Attached Grease, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (39)

DistanceCodeObservation
45.1MGO60% MAG COAT START
45.1DAGS
38.9DSZDEBRIE ROCKS SLUDGE
400.5DAGSGREASE OR SCALE
2DSGVDEBRIE
200DAGS
176TFCCapped
300.8TFOpen
124.1TFCCapped
352.5TFCCapped
2SSSPEELING CONCRETE SEVERE AGG ATTACHED
252.4TFCCapped
51.6TFCCapped
324.6TFActive
6.8DSZDEBRIE
45.1DAGS
400.5SSSPEELING CONCRETE SEVERE AGG ATTACHED
372.7TFCCapped
0MWM
400.5DSGVROCKS SLUDGE DEBRIE
63.5MGO90% MAG COAT START
194.8SAMSEVERE AGG
2DAGS
0AMH4:40AM
152.2TFCCapped
6.8TFCCapped
126.6DAGS
126.6DAGS
2SAMSEVERE AGG
200TFCCapped
0MWL
228.4TFCCapped
400.5SAMSEVERE AGG
200DAGS
23TFCCapped
276.4TFCCapped
400.9AMH5:30AM
0MGOConn. @ Mh, 9 O' Clock. Active
400.5MGO90% MAG COAT FINISH

Properties (6)

custom_field_three
PEELING CONCRETE SEVERE AGG ATTACHED
custom_field_two
1
customer
LACSD
datetime
2019-05-15T04:32:50-07:00
documentation
MARTIN,REVELES,RUVALCABA
is_lateral_inspection
false