A 0306_A 0305_5142019_021731.mp4
2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE
8 ft. - General Observation - HANGING MASTIC AT JOINTS START
8 ft. - General Observation - 95% MAG COAT START
13.1 ft. - General Observation - SEALED JOINTS LOOSE OUTER EDGE START
16.7 ft. - General Observation - LOOSE SEAM
32 ft. - General Observation - LOOSE SEAM
41.2 ft. - General Observation - LOOSE SEAM
49 ft. - General Observation - LOOSE OUTER EDGE OF JOINTS
89.3 ft. - General Observation - LOOSE SEAM
97.6 ft. - General Observation - LOOSE SEAM
128.2 ft. - General Observation - LOOSE SEAM
135.8 ft. - General Observation - LOOSE SEAM
144.4 ft. - General Observation - LOOSE SEAM
184.1 ft. - General Observation - LOOSE SEAM
216.7 ft. - General Observation - LOOSE SEAM
223.8 ft. - General Observation - LOOSE SEAM
248.3 ft. - General Observation - LOOSE SEAM
257.2 ft. - General Observation - LOOSE SEAM
264.4 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE
272.1 ft. - General Observation - SPECIAL PIPE JOINTS START
447.2 ft. - General Observation - DROP IN FLOW LEVEL-POSSIBLE UNDER FLOW OBSTRUCTION-APPOX 15%
447.2 ft. - General Observation - 80% MAG COAT
585.1 ft. - General Observation - SPECIAL JOINTS FINISH
647 ft. - General Observation - 95% MAG COAT START
| Distance | Code | Observation |
|---|---|---|
| 0 | AMH | 2:15AM |
| 264.4 | SSS | BLISTERING PEELING CONCRETE |
| 447.2 | MWL | — |
| 647 | MGO | 95% MAG COAT START |
| 662.2 | MWM | — |
| 16.7 | MGO | LOOSE SEAM |
| 447.2 | MWM | — |
| 1080.8 | AMH | 3:20AM |
| 257.2 | MGO | LOOSE SEAM |
| 8 | MGO | HANGING MASTIC AT JOINTS START |
| 49 | MGO | LOOSE OUTER EDGE OF JOINTS |
| 662.2 | SSS | BLISTERING PEELING CONCRETE |
| 135.8 | MGO | LOOSE SEAM |
| 2 | SSS | BLISTERING PEELING CONCRETE |
| 32 | MGO | LOOSE SEAM |
| 89.3 | MGO | LOOSE SEAM |
| 41.2 | MGO | LOOSE SEAM |
| 447.2 | MGO | DROP IN FLOW LEVEL-POSSIBLE UNDER FLOW OBSTRUCTION-APPOX 15% |
| 272.1 | MGO | SPECIAL PIPE JOINTS START |
| 264.4 | MGO | LOOSE OUTER EDGE FINISH |
| 264.4 | MGO | LOOSE MASTIC AT JOINTS FINISH |
| 216.7 | MGO | LOOSE SEAM |
| 8 | MGO | 95% MAG COAT START |
| 1080.3 | SSS | BLISTERING PEELING CONCRETE |
| 97.6 | MGO | LOOSE SEAM |
| 662.2 | MWL | — |
| 585.1 | MGO | SPECIAL JOINTS FINISH |
| 447.2 | MGO | 80% MAG COAT |
| 0 | MWM | — |
| 128.2 | MGO | LOOSE SEAM |
| 144.4 | MGO | LOOSE SEAM |
| 184.1 | MGO | LOOSE SEAM |
| 223.8 | MGO | LOOSE SEAM |
| 0 | MWL | — |
| 662.2 | SSS | BLISTERING PEELING CONCRETE |
| 248.3 | MGO | LOOSE SEAM |
| 1080.3 | MGO | 955 MAG COAT FINISH |
| 13.1 | MGO | SEALED JOINTS LOOSE OUTER EDGE START |