2 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
3 ft. - Surface Reinforcement Corroded, from 09 to 01 o'clock, within 8 inches of joint: NO, Start - CIRCUM REBAR
8 ft. - General Observation - POSSIBLE CORE SAMPLE PLUG
8.1 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG
16.7 ft. - General Observation - 50% MAG COAT START
31.4 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE
53.4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
63.4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG
76.3 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
125.6 ft. - General Observation - 70% MAG COAT START
157.4 ft. - Surface Reinforcement Visible, from 01 to 03 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
237.8 ft. - Surface Aggregate Projecting, from 08 to 10 o'clock, within 8 inches of joint: NO - SEVERE AGG
| Distance | Code | Observation |
|---|---|---|
| 63.4 | SAP | SEVERE AGG |
| 125.6 | MGO | 70% MAG COAT START |
| 8.1 | SAM | SEVERE AGG |
| 53.4 | SAM | SEVERRE AGG |
| 0 | MWM | — |
| 8 | MGO | POSSIBLE CORE SAMPLE PLUG |
| 157.4 | SRV | CIRCUM REBAR |
| 396.7 | AMH | 5:25AM |
| 2 | SAM | SEVERE AGG |
| 0 | MGO | Conn. @ Mh, 3 O' Clock. Active |
| 396.3 | SSS | PEELING CONCRETE |
| 53.4 | SAP | SEVERE AGG |
| 0 | MGO | Conn. @ Mh, 9 O' Clock. Active |
| 0 | MWL | — |
| 237.8 | SAP | SEVERE AGG |
| 76.3 | SRV | CIRCUM REBAR |
| 396.3 | SAP | SEVERE AGG |
| 3 | SRC | CIRCUM REBAR |
| 0 | AMH | 4:45AM |
| 396.3 | MGO | 70% MAG COAT FINISH |
| 16.7 | MGO | 50% MAG COAT START |
| 31.4 | SSS | PEELING CONCRETE |
| 16.7 | SRC | CIRCUM REBAR |