Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 8, 2019, 09:17 AM
  • 18 0441_18 0440_582019_024242.mp4

Date
05/08/2019
W/O
0767446
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00675
PipeID
P14292
Time
2:17 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1201
Sewer Name
18 FLORENCE AVENUE TRUNK
City
SAMTA FE SPRINGS
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
19
Purpose
Routine Assessment
Project
20190508MDM_FLORENCE_AVENUE_TRUNK
Material
NRCP
Shape
Circular
Height
18 in.
Upstream MH
18 0441
Downstream MH
18 0440
Dir. of Survey
Downstream
Length Surveyed
402.9 ft.
Total Length
402.9 ft.
Structural Index
3
Structural Quick
4232
Structural Rating
18
O&M Index
3
O&M Quick
4332
O&M Rating
40
Overall Index
3
Overall Quick
Overall Rating
58
Pipe schematic from manhole 18 0441 to 18 0440
MH: 18 0441MH: 18 0440downstream0 ft.0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 2:45AM0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active0 ft. MWM - Water Mark, 40 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 07 to 09 o'clock, , within 8 inches of joint: NO - GREASE POSSIBLE SCALE2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG8 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIE9.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped15.3 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG29.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open29.2 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES - DEBRIE36.5 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - DEBRIE36.5 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish - DEBRIE53.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped57.5 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 03 to 05 o'clock, , within 8 inches of joint: NO - GREASE OR SCALE61 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish - DEBRIE70.3 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIE70.3 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 02 to 05 o'clock, , within 8 inches of joint: NO - GREASE OR SCALE77.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped81.1 ft. DAZ - Deposits Attached Other, 25 %of cross sectional area, from 02 to 06 o'clock, , within 8 inches of joint: YES - GREASE OR SCALE101.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped107.5 ft. DAZ - Deposits Attached Other, 5 %of cross sectional area, from 03 to 05 o'clock, , within 8 inches of joint: NO - GREASE OR SCALE114.6 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - SLUDGE125.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped130 ft. MGP - General Photograph - GREASE OR SCALE130 ft. DSZ - Deposits Settled Other, 25 %of cross sectional area, from 06 to 10 o'clock, , within 8 inches of joint: YES - GREASE OR SCALE135.4 ft. MWL - Water Level, 5 %of cross sectional area135.4 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish - DEBRIE135.4 ft. DAZ - Deposits Attached Other, 10 %of cross sectional area, from 03 to 06 o'clock, , within 8 inches of joint: YES, Start - GREASE OR SCALE135.4 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish - DEBRIE147.1 ft. SAM - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG153.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open156.9 ft. SAM - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG178.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped189.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 07 to 09 o'clock, , within 8 inches of joint: YES - OR SCALE197.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE197.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTACHED197.1 ft. DAZ - Deposits Attached Other, 10 %of cross sectional area, from 03 to 06 o'clock, , within 8 inches of joint: YES, Finish - GREASE OR SCALE197.1 ft. SAM - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG202.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped213.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 07 to 10 o'clock, , within 8 inches of joint: NO, Start - OR SCALE226 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Active237.4 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIE250.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped278.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped303.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped321.4 ft. DAGS - Deposits Attached Grease, 25 %of cross sectional area, from 06 to 09 o'clock, , within 8 inches of joint: NO, Start - OR SCALE327.5 ft. DAGS - Deposits Attached Grease, 25 %of cross sectional area, from 06 to 09 o'clock, , within 8 inches of joint: NO, Finish - OR SCALE342.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 07 to 10 o'clock, , within 8 inches of joint: NO, Finish - OR SCALE350.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped374.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped402.6 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG402.6 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish - DEBRIE402.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - PEELING CONCRETYE SEVERE AGG ATTACHED402.6 ft. SAM - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG402.9 ft. AMH - Downstream Manhole, Survey Ends - 3:55AM

Observation photos (22)

  • Deposits Attached Grease, 5 %of cross sectional area, from 07 to 09 o'clock,  , within 8 inches of joint: NO - GREASE POSSIBLE SCALE

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 07 to 09 o'clock, , within 8 inches of joint: NO - GREASE POSSIBLE SCALE

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Deposits Settled Other,  5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start - DEBRIE

    8 ft. - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIE

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG

    15.3 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Deposits Settled Other,  15 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES - DEBRIE

    29.2 ft. - Deposits Settled Other, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES - DEBRIE

  • Deposits Settled Other,  10 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start - DEBRIE

    36.5 ft. - Deposits Settled Other, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - DEBRIE

  • Deposits Settled Other,  5 %of cross sectional area, from 03 to 05 o'clock,  , within 8 inches of joint: NO - GREASE OR SCALE

    57.5 ft. - Deposits Settled Other, 5 %of cross sectional area, from 03 to 05 o'clock, , within 8 inches of joint: NO - GREASE OR SCALE

  • Deposits Settled Other,  10 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start - DEBRIE

    70.3 ft. - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIE

  • Deposits Settled Other,  5 %of cross sectional area, from 02 to 05 o'clock,  , within 8 inches of joint: NO - GREASE OR SCALE

    70.3 ft. - Deposits Settled Other, 5 %of cross sectional area, from 02 to 05 o'clock, , within 8 inches of joint: NO - GREASE OR SCALE

  • Deposits Attached Other, 25 %of cross sectional area, from 02 to 06 o'clock,  , within 8 inches of joint: YES - GREASE OR SCALE

    81.1 ft. - Deposits Attached Other, 25 %of cross sectional area, from 02 to 06 o'clock, , within 8 inches of joint: YES - GREASE OR SCALE

  • Deposits Attached Other, 5 %of cross sectional area, from 03 to 05 o'clock,  , within 8 inches of joint: NO - GREASE OR SCALE

    107.5 ft. - Deposits Attached Other, 5 %of cross sectional area, from 03 to 05 o'clock, , within 8 inches of joint: NO - GREASE OR SCALE

  • Deposits Settled Other,  15 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start - SLUDGE

    114.6 ft. - Deposits Settled Other, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - SLUDGE

  • General Photograph - GREASE OR SCALE

    130 ft. - General Photograph - GREASE OR SCALE

  • Deposits Settled Other,  25 %of cross sectional area, from 06 to 10 o'clock,  , within 8 inches of joint: YES - GREASE OR SCALE

    130 ft. - Deposits Settled Other, 25 %of cross sectional area, from 06 to 10 o'clock, , within 8 inches of joint: YES - GREASE OR SCALE

  • Deposits Attached Other, 10 %of cross sectional area, from 03 to 06 o'clock,  , within 8 inches of joint: YES, Start - GREASE OR SCALE

    135.4 ft. - Deposits Attached Other, 10 %of cross sectional area, from 03 to 06 o'clock, , within 8 inches of joint: YES, Start - GREASE OR SCALE

  • Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    147.1 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Deposits Attached Grease, 5 %of cross sectional area, from 07 to 09 o'clock,  , within 8 inches of joint: YES - OR SCALE

    189.7 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 07 to 09 o'clock, , within 8 inches of joint: YES - OR SCALE

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTACHED

    197.1 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTACHED

  • Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    197.1 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Deposits Attached Grease, 5 %of cross sectional area, from 07 to 10 o'clock,  , within 8 inches of joint: NO, Start - OR SCALE

    213.6 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 07 to 10 o'clock, , within 8 inches of joint: NO, Start - OR SCALE

  • Deposits Attached Grease, 25 %of cross sectional area, from 06 to 09 o'clock,  , within 8 inches of joint: NO, Start - OR SCALE

    321.4 ft. - Deposits Attached Grease, 25 %of cross sectional area, from 06 to 09 o'clock, , within 8 inches of joint: NO, Start - OR SCALE

Observations (58)

DistanceCodeObservation
61DSZDEBRIE
0
374.6TFCCapped
226TFActive
135.4MWL
278.4TFCCapped
402.9AMH3:55AM
81.1DAZGREASE OR SCALE
15.3SAPSEVERE AGG
29.2TFOpen
197.1SSSBLISTERING PEELING CONCRETE
53.7TFCCapped
0MWL
57.5DSZGREASE OR SCALE
2DAGSGREASE POSSIBLE SCALE
125.3TFCCapped
0AMH2:45AM
402.6SAPSEVERE AGG
77.2TFCCapped
327.5DAGSOR SCALE
402.6DSZDEBRIE
8DSZDEBRIE
321.4DAGSOR SCALE
70.3DSZDEBRIE
342.9DAGSOR SCALE
70.3DSZGREASE OR SCALE
197.1SSSPEELING CONCRETE SEVERE AGG ATTACHED
36.5DSZDEBRIE
156.9SAMSEVERE AGG
135.4DSZDEBRIE
250.7TFCCapped
2SSSBLISTERING PEELING CONCRETE
135.4DAZGREASE OR SCALE
2SAPSEVERE AGG
213.6DAGSOR SCALE
107.5DAZGREASE OR SCALE
189.7DAGSOR SCALE
303.2TFCCapped
237.4DSZDEBRIE
101.5TFCCapped
0MGOConn. @ Mh, 3 O' Clock. Active
130MGPGREASE OR SCALE
178.9TFCCapped
153.9TFOpen
0MWM
114.6DSZSLUDGE
130DSZGREASE OR SCALE
350.7TFCCapped
147.1SAMSEVERE AGG
9.1TFCCapped
402.6SSSPEELING CONCRETYE SEVERE AGG ATTACHED
402.6SAMSEVERE AGG
197.1DAZGREASE OR SCALE
135.4DSZDEBRIE
36.5DSZDEBRIE
29.2DSZDEBRIE
197.1SAMSEVERE AGG
202.5TFCCapped

Properties (6)

custom_field_three
PEELING CONCRETE SEVERE AGG ATTACHED
custom_field_two
2
customer
LACSD
datetime
2019-05-08T02:17:13-07:00
documentation
MARTIN,REVELES,OLIVER 111,RUVALCABA
is_lateral_inspection
false