Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 8, 2019, 07:41 AM
  • 18 0442_18 0441_582019_005229.mp4

Date
05/08/2019
W/O
0767446
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00675
PipeID
P14293
Time
12:41 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1201
Sewer Name
18 FLORENCE AVENUE TRUNK
City
SAMTA FE SPRINGS
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
19
Purpose
Routine Assessment
Project
20190508MDM_FLORENCE_AVENUE_TRUNK
Material
NRCP
Shape
Circular
Height
18 in.
Upstream MH
18 0441
Downstream MH
18 0442
Dir. of Survey
Upstream
Length Surveyed
345.8 ft.
Total Length
345.8 ft.
Structural Index
3
Structural Quick
4432
Structural Rating
30
O&M Index
4
O&M Quick
5147
O&M Rating
37
Overall Index
3
Overall Quick
Overall Rating
67
Pipe schematic from manhole 18 0441 to 18 0442
MH: 18 0441MH: 18 0442upstream0 ft. AMH - Upstream Manhole, Survey Ends - 2:10AM0.6 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG0.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG0.6 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active0.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - PEELING CONCRETE SEVERE AGG ATTACHED0.6 ft. DAZ - Deposits Attached Other, 25 %of cross sectional area, from 02 to 08 o'clock, , within 8 inches of joint: YES, Finish - GREASE POSSIBLE SCALE0.6 ft. SSS - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: NO, Finish - PEELING CONCRETE SEVERE AGG ATTACHED11.8 ft. MGP - General Photograph13.9 ft. DAZ - Deposits Attached Other, 25 %of cross sectional area, from 02 to 06 o'clock, , within 8 inches of joint: YES, Finish - GREASE POSSIBLE SCALE13.9 ft. DAZ - Deposits Attached Other, 25 %of cross sectional area, from 02 to 08 o'clock, , within 8 inches of joint: YES, Start - GREASE POSSIBLE SCALE14.8 ft. DAZ - Deposits Attached Other, 25 %of cross sectional area, from 02 to 07 o'clock, , within 8 inches of joint: NO - GREASE POSSIBLE SCALE21.4 ft. DAZ - Deposits Attached Other, 25 %of cross sectional area, from 02 to 06 o'clock, , within 8 inches of joint: NO - P0SSIBLE SCALE24.8 ft. MGP - General Photograph - POSSIBLE SCALE24.8 ft. DAZ - Deposits Attached Other, 25 %of cross sectional area, from 02 to 06 o'clock, , within 8 inches of joint: YES, Start - GREASE POSSIBLE SCALE41 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 02 to 05 o'clock, , within 8 inches of joint: YES, Finish - GREASE POSSIBLE SCALE42.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped45.7 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 02 to 05 o'clock, , within 8 inches of joint: YES, Start - GREASE POSSIBLE SCALE63.2 ft. SSS - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: NO, Start - PEELING CONCRETE SEVERE AGG ATTACHED65.5 ft. DSZ - Deposits Settled Other, 25 %of cross sectional area, from 02 to 08 o'clock, , within 8 inches of joint: YES, Finish - GREASE POSSIBLE SCALE66.8 ft. MWM - Water Mark, 75 %of cross sectional area67.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped76.2 ft. DSZ - Deposits Settled Other, 25 %of cross sectional area, from 02 to 08 o'clock, , within 8 inches of joint: YES, Start - GREASE POSSIBLE SCALE76.7 ft. DSZ - Deposits Settled Other, 25 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: NO - POSSIBLE SCALE79.9 ft. DSZ - Deposits Settled Other, 25 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: NO - GREASE & POSSIBLE SCALE79.9 ft. MGP - General Photograph - GREASE POSSIBLE SCALE79.9 ft. MGP - General Photograph - GREASE POSSIBLE SCALE94.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - MULTILAYER PEELING SEVERE AGG ATTACHED97.1 ft. SAM - Surface Aggregate Missing, from 08 to 11 o'clock, within 8 inches of joint: NO - SEVERE AGG119.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped138.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE138.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTACHED139.7 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG143.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open153.9 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG167.6 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Capped191.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open206 ft. DAZ - Deposits Attached Other, 5 %of cross sectional area, from 07 to 09 o'clock, , within 8 inches of joint: YES - GREASE OR POSSIBLE SCALE219.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped226.2 ft. SAM - Surface Aggregate Missing, from 08 to 10 o'clock, within 8 inches of joint: YES - SEVERE AGG244.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped268.7 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Capped270.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG296.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped320 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped343.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE343.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG345.8 ft. MWM - Water Mark, 30 %of cross sectional area345.8 ft. MWL - Water Level, 10 %of cross sectional area345.8 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active345.8 ft. AMH - Downstream Manhole, Survey Begins - 12:55AM

Observation photos (25)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

    75.5 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Aggregate Missing, from 08 to 10 o'clock, within 8 inches of joint: YES - SEVERE AGG

    119.6 ft. - Surface Aggregate Missing, from 08 to 10 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • Deposits Attached Other, 5 %of cross sectional area, from 07 to 09 o'clock,  , within 8 inches of joint: YES - GREASE OR POSSIBLE SCALE

    139.8 ft. - Deposits Attached Other, 5 %of cross sectional area, from 07 to 09 o'clock, , within 8 inches of joint: YES - GREASE OR POSSIBLE SCALE

  • Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    191.9 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

    206.1 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTACHED

    207 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTACHED

  • Surface Aggregate Missing, from 08 to 11 o'clock, within 8 inches of joint: NO - SEVERE AGG

    248.7 ft. - Surface Aggregate Missing, from 08 to 11 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - MULTILAYER PEELING SEVERE AGG ATTACHED

    250.9 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - MULTILAYER PEELING SEVERE AGG ATTACHED

  • Deposits Settled Other,  25 %of cross sectional area, from 02 to 10 o'clock,  , within 8 inches of joint: NO - GREASE & POSSIBLE SCALE

    265.9 ft. - Deposits Settled Other, 25 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: NO - GREASE & POSSIBLE SCALE

  • General Photograph - GREASE POSSIBLE SCALE

    265.9 ft. - General Photograph - GREASE POSSIBLE SCALE

  • General Photograph - GREASE POSSIBLE SCALE

    265.9 ft. - General Photograph - GREASE POSSIBLE SCALE

  • Deposits Settled Other,  25 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: NO - POSSIBLE SCALE

    269.1 ft. - Deposits Settled Other, 25 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: NO - POSSIBLE SCALE

  • Deposits Settled Other,  25 %of cross sectional area, from 02 to 08 o'clock,  , within 8 inches of joint: YES, Start - GREASE POSSIBLE SCALE

    269.6 ft. - Deposits Settled Other, 25 %of cross sectional area, from 02 to 08 o'clock, , within 8 inches of joint: YES, Start - GREASE POSSIBLE SCALE

  • Water Mark, 75 %of cross sectional area

    279 ft. - Water Mark, 75 %of cross sectional area

  • Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: NO, Start - PEELING CONCRETE SEVERE AGG ATTACHED

    282.6 ft. - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: NO, Start - PEELING CONCRETE SEVERE AGG ATTACHED

  • Deposits Settled Other,  10 %of cross sectional area, from 02 to 05 o'clock,  , within 8 inches of joint: YES, Start - GREASE POSSIBLE SCALE

    300.1 ft. - Deposits Settled Other, 10 %of cross sectional area, from 02 to 05 o'clock, , within 8 inches of joint: YES, Start - GREASE POSSIBLE SCALE

  • Deposits Settled Other,  10 %of cross sectional area, from 02 to 05 o'clock,  , within 8 inches of joint: YES, Finish - GREASE POSSIBLE SCALE

    304.8 ft. - Deposits Settled Other, 10 %of cross sectional area, from 02 to 05 o'clock, , within 8 inches of joint: YES, Finish - GREASE POSSIBLE SCALE

  • General Photograph - POSSIBLE SCALE

    321 ft. - General Photograph - POSSIBLE SCALE

  • Deposits Attached Other, 25 %of cross sectional area, from 02 to 06 o'clock,  , within 8 inches of joint: YES, Start - GREASE POSSIBLE SCALE

    321 ft. - Deposits Attached Other, 25 %of cross sectional area, from 02 to 06 o'clock, , within 8 inches of joint: YES, Start - GREASE POSSIBLE SCALE

  • Deposits Attached Other, 25 %of cross sectional area, from 02 to 06 o'clock,  , within 8 inches of joint: NO - P0SSIBLE SCALE

    324.4 ft. - Deposits Attached Other, 25 %of cross sectional area, from 02 to 06 o'clock, , within 8 inches of joint: NO - P0SSIBLE SCALE

  • Deposits Attached Other, 25 %of cross sectional area, from 02 to 07 o'clock,  , within 8 inches of joint: NO - GREASE POSSIBLE SCALE

    331 ft. - Deposits Attached Other, 25 %of cross sectional area, from 02 to 07 o'clock, , within 8 inches of joint: NO - GREASE POSSIBLE SCALE

  • Deposits Attached Other, 25 %of cross sectional area, from 02 to 08 o'clock,  , within 8 inches of joint: YES, Start - GREASE POSSIBLE SCALE

    331.9 ft. - Deposits Attached Other, 25 %of cross sectional area, from 02 to 08 o'clock, , within 8 inches of joint: YES, Start - GREASE POSSIBLE SCALE

  • General Photograph

    334 ft. - General Photograph

Observations (50)

DistanceCodeObservation
77.1TFCCapped
178.2TFCCapped
269.6DSZGREASE POSSIBLE SCALE
345.8AMH2:10AM
345.2SAMSEVERE AGG
345.2SAPSEVERE AGG
345.2MGOConn. @ Mh, 9 O' Clock. Active
0MWM
278.5TFCCapped
119.6SAMSEVERE AGG
331.9DAZGREASE POSSIBLE SCALE
265.9DSZGREASE & POSSIBLE SCALE
282.6SSSPEELING CONCRETE SEVERE AGG ATTACHED
207SSSBLISTERING PEELING CONCRETE
226.6TFCCapped
304.8DSZGREASE POSSIBLE SCALE
303TFCCapped
331.9DAZGREASE POSSIBLE SCALE
202.6TFOpen
75.5SAPSEVERE AGG
0MWL
265.9MGPGREASE POSSIBLE SCALE
154TFOpen
248.7SAMSEVERE AGG
324.4DAZP0SSIBLE SCALE
191.9SAMSEVERE AGG
139.8DAZGREASE OR POSSIBLE SCALE
345.2SSSPEELING CONCRETE SEVERE AGG ATTACHED
265.9MGPGREASE POSSIBLE SCALE
280.3DSZGREASE POSSIBLE SCALE
331DAZGREASE POSSIBLE SCALE
321MGPPOSSIBLE SCALE
2SSSBLISTERING PEELING CONCRETE
125.9TFCCapped
321DAZGREASE POSSIBLE SCALE
0MGOConn. @ Mh, 3 O' Clock. Active
250.9SSSMULTILAYER PEELING SEVERE AGG ATTACHED
269.1DSZPOSSIBLE SCALE
300.1DSZGREASE POSSIBLE SCALE
0AMH12:55AM
279MWM
101.5TFCCapped
207SSSPEELING CONCRETE SEVERE AGG ATTACHED
206.1SAMSEVERE AGG
25.8TFCCapped
334MGP
345.2DAZGREASE POSSIBLE SCALE
345.2SSSPEELING CONCRETE SEVERE AGG ATTACHED
49.1TFCCapped
2SAPSEVERE AGG

Properties (6)

custom_field_three
PEELING CONCRETE SEVERE AGG ATTACHED
custom_field_two
2
customer
LACSD
datetime
2019-05-08T00:41:25-07:00
documentation
MARTIN,REVELES,OLIVER 111,RUVALCABA
is_lateral_inspection
false