Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 8, 2019, 08:39 PM
  • 18 0441_18 0440_582019_134143.mp4

Date
05/08/2019
W/O
0767446
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00675
PipeID
P14292
Time
1:39 PM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Jetting
Media Label
7978
Sewer Name
18 FLORENCE AVENUE TRUNK
City
SANTE FE SPRINGS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
19
Purpose
Maintenance Related
Project
20190508DF_FLORENCE_AVENUE_TRUNK
Material
NRCP
Shape
Circular
Height
18 in.
Upstream MH
18 0441
Downstream MH
18 0440
Dir. of Survey
Downstream
Length Surveyed
87.7 ft.
Total Length
87.7 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 18 0441 to 18 0440
MH: 18 0441MH: 18 0440downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 1:40 PM2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start7.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"28.3 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 4" - Open52.4 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 4"76.2 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 4"87.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish87.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish87.7 ft. MSA - Survey Abandoned - HIGH WATER

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
7.8TFC
87.6SSS
87.7MSAHIGH WATER
0MWM
2SAP
0MWL
76.2TFC
2SSS
0AMH1:40 PM
28.3TFOpen
52.4TFC
87.6SAP

Properties (6)

additional_info
POST CLEANING EVALUATION ONLY.
custom_field_two
5
customer
LACSD
datetime
2019-05-08T13:39:11-07:00
documentation
FRANKLIN, CASTILLO, BRAR
is_lateral_inspection
false