19 0091_19 0090_592019_050740.mp4
2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE
2 ft. - General Observation - 30% MAG COAT START
2 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
2.5 ft. - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - LONG CIRCUM REBAR
8.5 ft. - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
8.5 ft. - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
8.5 ft. - General Observation - 90% MAG COAT START
75 ft. - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - LONG CIRCUM REBAR
99.5 ft. - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - LONG CIRCUM REBAR
| Distance | Code | Observation |
|---|---|---|
| 2.5 | SRC | LONG CIRCUM REBAR |
| 82.4 | SRC | LONG CIRCUM REBAR |
| 8.5 | SRC | CIRCUM REBAR |
| 99.5 | SRC | LONG CIRCUM REBAR |
| 8.5 | SRC | CIRCUM REBAR |
| 0 | AMH | 5:05AM |
| 15.7 | SRC | LONG CIRCUM REBAR |
| 8.5 | MGO | 90% MAG COAT START |
| 166.3 | SAV | SEVERE AGG |
| 2 | SSS | BLISTERING PEELING CONCRETE |
| 0 | MWL | — |
| 75 | SRC | LONG CIRCUM REBAR |
| 137.6 | MGO | 20% MAG COAT START |
| 2 | MGO | 30% MAG COAT START |
| 166.7 | AMH | 5:30AM |
| 105 | SRC | LONG CIRCUM REBAR |
| 166.3 | MGO | 20% MAG COAT FINISH |
| 166.3 | SSS | BLISTERING PEELING CONCRETE |
| 0 | MWM | — |
| 2 | SAV | SEVERE AGG |