19 0092_19 0091_592019_042256.mp4
2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE
2 ft. - General Observation - 60% MAG COAT START
2 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC
23.5 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - PEELING CONCRETE
44.6 ft. - Surface Aggregate Projecting, from 09 to 11 o'clock, within 8 inches of joint: YES - SEVERE AGG
96.5 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG
97.6 ft. - Water Level, 40 %of cross sectional area - FLOW INCREASE
129.9 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - PEELING CONCRETE
184.3 ft. - Surface Reinforcement Visible, from 01 to 03 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
246.2 ft. - Surface Reinforcement Visible, from 09 to 11 o'clock, within 8 inches of joint: YES - CIRCUM REBAR
254.6 ft. - Surface Reinforcement Visible, from 09 to 11 o'clock, within 8 inches of joint: YES, Start - CIRCUM REBAR
262.6 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - CIRCUM REBAR
276.9 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - CIRCUM REBAR
279.6 ft. - Surface Reinforcement Visible, at 12 o'clock, within 8 inches of joint: YES, Start - LONG REBAR
308.5 ft. - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - LONG CIRCUM REBAR
| Distance | Code | Observation |
|---|---|---|
| 2 | SSS | BLISTERING PEELING CONCRETE |
| 279.6 | SRV | LONG REBAR |
| 23.5 | MGO | 20% MAG COAT START |
| 44.6 | SAP | SEVERE AGG |
| 129.9 | SSS | PEELING CONCRETE |
| 311.5 | MGO | 20% MAG COAT FINISH |
| 269.3 | SRC | CIRCUM REBAR |
| 311.5 | SRV | CIRCUM LONG REBAR |
| 254.6 | SRV | CIRCUM REBAR |
| 184.3 | SRV | CIRCUM REBAR |
| 23.5 | SSS | PEELING CONCRETE |
| 0 | AMH | 4:20AM |
| 258 | SRV | CIRCUM REBAR |
| 2 | MGO | 60% MAG COAT START |
| 276.9 | SRC | CIRCUM REBAR |
| 246.2 | SRV | CIRCUM REBAR |
| 295.9 | SRC | CIRCUM REBAR |
| 311.5 | SSS | PEELING CONCRETE |
| 295.8 | SRV | LONG REBAR |
| 262.6 | SRC | CIRCUM REBAR |
| 308.5 | SRV | LONG CIRCUM REBAR |
| 97.6 | MWL | FLOW INCREASE |
| 96.5 | SAV | SEVERE AGG |
| 0 | MWL | — |
| 311.5 | SAV | SEVEWRE AGG |
| 0 | MWM | — |
| 311.9 | AMH | 5:00AM |
| 2 | SAV | SEVERE AGG SPORATIC |