Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 8, 2019, 01:30 PM
  • 03 476_03 0475_382019_054536.mp4

Date
03/08/2019
W/O
0745398
Weather
Light Rain
Operator/Surveyor
FRANKLIN
Sewer ID
Z00401
PipeID
P05196
Time
5:30 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7936
Sewer Name
03 PUMP DISTRICT #5 CONNECTION TRUNK
City
LONG BEACH
Loc. details
Other
Location Code
Z
Use of Sewer
Sanitary Sewer
District
District 03
Page No.
22
Purpose
Capital Improvement Program Assesment
Project
20190308DF_PUMP_DISTRICT_5_CONNECTION_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Upstream MH
03 0476
Downstream MH
03 0475
Dir. of Survey
Downstream
Length Surveyed
256.1 ft.
Total Length
256.1 ft.
Structural Index
2
Structural Quick
5241
Structural Rating
29
O&M Index
2
O&M Quick
4133
O&M Rating
63
Overall Index
2
Overall Quick
Overall Rating
92
Pipe schematic from manhole 03 0476 to 03 0475
MH: 03 0476MH: 03 0475downstream0 ft. AMH - Upstream Manhole, Survey Begins - 5:32 AM0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3 ft. JOL - Joint Offset Large, 1"10 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start24.2 ft. JOM - Joint Offset Medium, .5"30.2 ft. MGP - General Photograph33.5 ft. MGP - General Photograph36.4 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES36.4 ft. MGP - General Photograph39.3 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES39.3 ft. MGP - General Photograph39.8 ft. MGP - General Photograph42.5 ft. MGP - General Photograph42.5 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES45.3 ft. MGP - General Photograph45.3 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES57.5 ft. MGP - General Photograph57.5 ft. MGP - General Photograph57.5 ft. ID - Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES60.5 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES60.5 ft. ID - Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES63.5 ft. MGP - General Photograph63.5 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES66.5 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES69.7 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES72.6 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES75.4 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES78.7 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES81.4 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES84.7 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES87.7 ft. MGP - General Photograph90.7 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES93.6 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES96.5 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES96.5 ft. ID - Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES102.8 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 11 o'clock, , within 8 inches of joint: YES105.6 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 11 o'clock, , within 8 inches of joint: YES108.9 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 12 to 05 o'clock, , within 8 inches of joint: YES123.8 ft. MGP - General Photograph127 ft. JOM - Joint Offset Medium, .5"129.7 ft. JOM - Joint Offset Medium, .5"151.1 ft. MGP - General Photograph151.1 ft. B - Broken, from 08 to 04 o'clock, within 8 inches of joint: YES151.1 ft. MGP - General Photograph162.9 ft. B - Broken, from 08 to 04 o'clock, within 8 inches of joint: YES162.9 ft. MGP - General Photograph181.2 ft. FM - Fracture Multiple, from 09 to 12 o'clock, within 8 inches of joint: YES196.2 ft. JOM - Joint Offset Medium, .5"200.7 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES202 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES205.5 ft. JOM - Joint Offset Medium, .5"211.4 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES214.2 ft. JAM - Joint Angular Medium, .5"217.3 ft. JAM - Joint Angular Medium, .5"223.7 ft. JAM - Joint Angular Medium, .5"239.4 ft. MGP - General Photograph241.4 ft. IR - Infiltration Runner, at 12 o'clock, within 8 inches of joint: YES241.4 ft. MGP - General Photograph241.4 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES254.3 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish254.3 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish254.3 ft. MGO - General Observation - Grease Throughout The Reach (5%)254.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish254.3 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish256.1 ft. AMH - Downstream Manhole, Survey Ends - 6:52 AM

Observation photos (58)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Joint Offset Large, 1"

    3 ft. - Joint Offset Large, 1"

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start

    10 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start

  • Joint Offset Medium, .5"

    24.2 ft. - Joint Offset Medium, .5"

  • General Photograph

    30.2 ft. - General Photograph

  • General Photograph

    33.5 ft. - General Photograph

  • Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES

    36.4 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES

  • General Photograph

    36.4 ft. - General Photograph

  • Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES

    39.3 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES

  • General Photograph

    39.3 ft. - General Photograph

  • General Photograph

    39.8 ft. - General Photograph

  • General Photograph

    42.5 ft. - General Photograph

  • Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES

    42.5 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES

  • General Photograph

    45.3 ft. - General Photograph

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES

    45.3 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES

  • General Photograph

    57.5 ft. - General Photograph

  • General Photograph

    57.5 ft. - General Photograph

  • Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES

    57.5 ft. - Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES

  • Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES

    60.5 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES

  • Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES

    60.5 ft. - Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES

  • General Photograph

    63.5 ft. - General Photograph

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES

    63.5 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES

    66.5 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES

    69.7 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES

    72.6 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES

    75.4 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES

    78.7 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES

    81.4 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES

    84.7 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES

  • General Photograph

    87.7 ft. - General Photograph

  • Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES

    90.7 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES

    93.6 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES

  • Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES

    96.5 ft. - Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 11 o'clock,  , within 8 inches of joint: YES

    102.8 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 11 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 11 o'clock,  , within 8 inches of joint: YES

    105.6 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 11 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 12 to 05 o'clock,  , within 8 inches of joint: YES

    108.9 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 12 to 05 o'clock, , within 8 inches of joint: YES

  • General Photograph

    123.8 ft. - General Photograph

  • Joint Offset Medium, .5"

    127 ft. - Joint Offset Medium, .5"

  • Joint Offset Medium, .5"

    129.7 ft. - Joint Offset Medium, .5"

  • General Photograph

    151.1 ft. - General Photograph

  • Broken, from 08 to 04 o'clock, within 8 inches of joint: YES

    151.1 ft. - Broken, from 08 to 04 o'clock, within 8 inches of joint: YES

  • General Photograph

    151.1 ft. - General Photograph

  • Broken, from 08 to 04 o'clock, within 8 inches of joint: YES

    162.9 ft. - Broken, from 08 to 04 o'clock, within 8 inches of joint: YES

  • General Photograph

    162.9 ft. - General Photograph

  • Fracture Multiple, from 09 to 12 o'clock, within 8 inches of joint: YES

    181.2 ft. - Fracture Multiple, from 09 to 12 o'clock, within 8 inches of joint: YES

  • Joint Offset Medium, .5"

    196.2 ft. - Joint Offset Medium, .5"

  • Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES

    200.7 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES

    202 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES

  • Joint Offset Medium, .5"

    205.5 ft. - Joint Offset Medium, .5"

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES

    211.4 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES

  • Joint Angular Medium, .5"

    214.2 ft. - Joint Angular Medium, .5"

  • Joint Angular Medium, .5"

    217.3 ft. - Joint Angular Medium, .5"

  • Joint Angular Medium, .5"

    223.7 ft. - Joint Angular Medium, .5"

  • General Photograph

    239.4 ft. - General Photograph

  • Infiltration Runner, at 12 o'clock, within 8 inches of joint: YES

    241.4 ft. - Infiltration Runner, at 12 o'clock, within 8 inches of joint: YES

  • General Photograph

    241.4 ft. - General Photograph

  • Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES

    241.4 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES

Observations (69)

DistanceCodeObservation
0AMH5:32 AM
2DAGS
78.7DAE
36.4DAE
57.5MGP
2SSS
96.5DAE
254.3DAE
10DAE
42.5MGP
33.5MGP
127JOM
239.4MGP
162.9B
151.1MGP
211.4DAE
254.3DAGS
105.6DAE
24.2JOM
72.6DAE
39.3DAE
254.3MGOGrease Throughout The Reach (5%)
129.7JOM
241.4IR
63.5MGP
0MWM
3JOL
2CM
181.2FM
66.5DAE
151.1B
102.8DAE
39.8MGP
42.5DAE
57.5MGP
39.3MGP
200.7DAE
241.4MGP
151.1MGP
60.5DAE
30.2MGP
90.7DAE
63.5DAE
45.3MGP
60.5ID
57.5ID
205.5JOM
36.4MGP
254.3SSS
214.2JAM
241.4DAE
123.8MGP
223.7JAM
81.4DAE
87.7MGP
45.3DAE
196.2JOM
254.3CM
69.7DAE
162.9MGP
84.7DAE
256.1AMH6:52 AM
75.4DAE
93.6DAE
0MWL
217.3JAM
96.5ID
202DAE
108.9DAE

Properties (6)

custom_field_three
BROKEN PIPE AND WATER INFILTRATION
custom_field_two
1
customer
LACSD
datetime
2019-03-08T05:30:43-08:00
documentation
FRANKLIN, IGNACIO, RAMIREZ, RUVALCABA
is_lateral_inspection
false