Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 8, 2019, 12:46 PM
  • 03 0474_C 0511_382019_045123.mp4

Date
03/08/2019
W/O
0745398
Weather
Light Rain
Operator/Surveyor
FRANKLIN
Sewer ID
Z00401
PipeID
P05195
Time
4:46 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7936
Sewer Name
03 PUMP DISTRICT #5 CONNECTION TRUNK
City
LONG BEACH
Loc. details
Other
Location Code
Z
Use of Sewer
Sanitary Sewer
District
District 03
Page No.
22
Purpose
Capital Improvement Program Assesment
Project
20190308DF_PUMP_DISTRICT_5_CONNECTION_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Upstream MH
03 0474
Downstream MH
03 0475
Dir. of Survey
Upstream
Length Surveyed
37.4 ft.
Total Length
37.4 ft.
Structural Index
2
Structural Quick
3122
Structural Rating
10
O&M Index
3
O&M Quick
3100
O&M Rating
3
Overall Index
2
Overall Quick
Overall Rating
13
Pipe schematic from manhole 03 0474 to 03 0475
MH: 03 0474MH: 03 0475upstream0 ft. MGO - General Observation - GREASE THROUGHOUT THE REACH (5%)0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Ends - 5:05AM1.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish1.8 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish1.8 ft. DAGS - Deposits Attached Grease, 15 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish2.8 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES5.7 ft. JOM - Joint Offset Medium, .5"8.7 ft. JOM - Joint Offset Medium, .5"11.6 ft. JOM - Joint Offset Medium, .5"29 ft. MGP - General Photograph35.4 ft. DAGS - Deposits Attached Grease, 15 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start35.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 25% MAG35.4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start37.3 ft. MWM - Water Mark, 15 %of cross sectional area37.4 ft. AMH - Downstream Manhole, Survey Begins - 4:49 AM

Observation photos (10)

  • Downstream Manhole, Survey Begins - 4:49 AM

    0 ft. - Downstream Manhole, Survey Begins - 4:49 AM

  • Water Mark, 15 %of cross sectional area

    0.1 ft. - Water Mark, 15 %of cross sectional area

  • Deposits Attached Grease, 15 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 15 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 25% MAG

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 25% MAG

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Photograph

    8.4 ft. - General Photograph

  • Joint Offset Medium, .5"

    25.8 ft. - Joint Offset Medium, .5"

  • Joint Offset Medium, .5"

    28.7 ft. - Joint Offset Medium, .5"

  • Joint Offset Medium, .5"

    31.7 ft. - Joint Offset Medium, .5"

  • Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES

    34.6 ft. - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES

Observations (16)

DistanceCodeObservation
2DAGS
2SSS25% MAG
37.4MGOGREASE THROUGHOUT THE REACH (5%)
35.6SSS
0AMH4:49 AM
25.8JOM
37.4MWL
35.6CM
35.6DAGS
31.7JOM
2CM
34.6CL
37.4AMH5:05AM
8.4MGP
28.7JOM
0.1MWM

Properties (6)

additional_info
PIPE INFO ONSCREEN WAS INCORRECT. THIS REACH WAS MH 47 TO MH 475 U/S. PIPE ID IS P05195.
custom_field_two
3
customer
LACSD
datetime
2019-03-08T04:46:00-08:00
documentation
FRANKLIN, IGNACIO, RAMIREZ, RUVALCABA
is_lateral_inspection
false