Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 14, 2019, 07:44 AM
  • 18 0304_18 0303_3142019_010018.mp4

Date
03/14/2019
W/O
0759716
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00683
PipeID
P14135
Time
12:44 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1149
Sewer Name
18 LA MIRADA TRUNK, SECTS 1&2
City
LA MIRADA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
31
Purpose
Maintenance Related
Project
20190314MDM_LA_MIRADA_TRUNK_SECTS_1_2
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Upstream MH
18 0304
Downstream MH
18 0303
Dir. of Survey
Downstream
Length Surveyed
405.3 ft.
Total Length
405.3 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2900
O&M Rating
18
Overall Index
2
Overall Quick
Overall Rating
18
Pipe schematic from manhole 18 0304 to 18 0303
MH: 18 0304MH: 18 0303downstream0 ft. AMH - Upstream Manhole, Survey Begins - 12:45AM0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area37.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped44.5 ft. DSZ - Deposits Settled Other, 3 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - ROCK RAGS87.2 ft. DSZ - Deposits Settled Other, 3 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - PEELED CONCRETE99.3 ft. DSZ - Deposits Settled Other, 3 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - PEELED CONCRETE122.8 ft. MGO - General Observation - 18" RCP134.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped167.7 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - PEELED CONCRETE182.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open223.4 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - ROCKS234.7 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish - ROCKS239 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open263.4 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - ROCKS278.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped314.5 ft. DSZ - Deposits Settled Other, 3 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - ROCKS324.1 ft. DSZ - Deposits Settled Other, 3 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish - ROCKS327.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped339.4 ft. DSZ - Deposits Settled Other, 2 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - ROCKS356.6 ft. DSZ - Deposits Settled Other, 3 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - PEELED CONCRETE375.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped405.3 ft. AMH - Downstream Manhole, Survey Ends - 1:20AM

Observation photos (8)

  • Deposits Settled Other,  3 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES - ROCK RAGS

    44.5 ft. - Deposits Settled Other, 3 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - ROCK RAGS

  • Deposits Settled Other,  3 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES - PEELED CONCRETE

    87.2 ft. - Deposits Settled Other, 3 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - PEELED CONCRETE

  • Deposits Settled Other,  3 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES - PEELED CONCRETE

    99.3 ft. - Deposits Settled Other, 3 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - PEELED CONCRETE

  • General Observation - 18" RCP

    122.8 ft. - General Observation - 18" RCP

  • Deposits Settled Other,  5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES - PEELED CONCRETE

    167.7 ft. - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - PEELED CONCRETE

  • Deposits Settled Other,  5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start - ROCKS

    223.4 ft. - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - ROCKS

  • Deposits Settled Other,  5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES - ROCKS

    263.4 ft. - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - ROCKS

  • Deposits Settled Other,  3 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES - PEELED CONCRETE

    356.6 ft. - Deposits Settled Other, 3 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - PEELED CONCRETE

Observations (23)

DistanceCodeObservation
314.5DSZROCKS
278.9TFCCapped
239TFOpen
99.3DSZPEELED CONCRETE
0AMH12:45AM
223.4DSZROCKS
339.4DSZROCKS
327.2TFCCapped
324.1DSZROCKS
356.6DSZPEELED CONCRETE
234.7DSZROCKS
0MWM
87.2DSZPEELED CONCRETE
44.5DSZROCK RAGS
167.7DSZPEELED CONCRETE
0MWL
405.3AMH1:20AM
263.4DSZROCKS
182.5TFOpen
375.9TFCCapped
37.9TFCCapped
122.8MGO18" RCP
134.4TFCCapped

Properties (5)

additional_info
POST DEBRIS EVALUATION ONLY
customer
LACSD
datetime
2019-03-14T00:44:42-07:00
documentation
MARTIN,OLIVER 111,CASTILLO
is_lateral_inspection
false