44.5 ft. - Deposits Settled Other, 3 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - ROCK RAGS
87.2 ft. - Deposits Settled Other, 3 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - PEELED CONCRETE
99.3 ft. - Deposits Settled Other, 3 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - PEELED CONCRETE
122.8 ft. - General Observation - 18" RCP
167.7 ft. - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - PEELED CONCRETE
223.4 ft. - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - ROCKS
263.4 ft. - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - ROCKS
356.6 ft. - Deposits Settled Other, 3 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - PEELED CONCRETE
| Distance | Code | Observation |
|---|---|---|
| 314.5 | DSZ | ROCKS |
| 278.9 | TFC | Capped |
| 239 | TF | Open |
| 99.3 | DSZ | PEELED CONCRETE |
| 0 | AMH | 12:45AM |
| 223.4 | DSZ | ROCKS |
| 339.4 | DSZ | ROCKS |
| 327.2 | TFC | Capped |
| 324.1 | DSZ | ROCKS |
| 356.6 | DSZ | PEELED CONCRETE |
| 234.7 | DSZ | ROCKS |
| 0 | MWM | — |
| 87.2 | DSZ | PEELED CONCRETE |
| 44.5 | DSZ | ROCK RAGS |
| 167.7 | DSZ | PEELED CONCRETE |
| 0 | MWL | — |
| 405.3 | AMH | 1:20AM |
| 263.4 | DSZ | ROCKS |
| 182.5 | TF | Open |
| 375.9 | TFC | Capped |
| 37.9 | TFC | Capped |
| 122.8 | MGO | 18" RCP |
| 134.4 | TFC | Capped |