Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 13, 2019, 05:17 PM
  • 02 1112 _02 1111_3132019_102123.mp4

Date
03/13/2019
W/O
0760483
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00285
PipeID
P04603
Time
10:17 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7940
Sewer Name
02 MONTEBELLO-RANDOLPH TRUNK
City
COMMERCE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
20
Purpose
Maintenance Related
Project
20190313DF_MONTEBELLO_RANDOLH_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Upstream MH
02 1112
Downstream MH
02 1111
Dir. of Survey
Downstream
Length Surveyed
235.3 ft.
Total Length
235.3 ft.
Structural Index
3
Structural Quick
3221
Structural Rating
8
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
8
Pipe schematic from manhole 02 1112 to 02 1111
MH: 02 1112MH: 02 1111downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 10:19 AM0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - ROACHES @ MH31.9 ft. FS - Fracture Spiral, from 12 to 01 o'clock, within 8 inches of joint: YES45.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"195.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4", 4" - Unkown/90% GREASE LATERAL232.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish232.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish235.3 ft. AMH - Downstream Manhole, Survey Ends - 10:34 AM235.3 ft. MGO - General Observation - ROACHES @ MH235.3 ft. MGO - General Observation - GREASE THROUGHOUT THE REACH (5%)

Observation photos (4)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Spiral, from 12 to 01 o'clock, within 8 inches of joint: YES

    31.9 ft. - Fracture Spiral, from 12 to 01 o'clock, within 8 inches of joint: YES

  • Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4", 4" - Unkown/90% GREASE LATERAL

    195.5 ft. - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4", 4" - Unkown/90% GREASE LATERAL

Observations (14)

DistanceCodeObservation
31.9FS
232.9SSS
235.3AMH10:34 AM
195.5TFUnkown/90% GREASE LATERAL
45.1TFC
0MWM
2CM
235.3MGOROACHES @ MH
0AMH10:19 AM
235.3MGOGREASE THROUGHOUT THE REACH (5%)
232.9CM
2SSS
2MGOROACHES @ MH
0MWL

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2019-03-13T10:17:27-07:00
documentation
FRANKLIN, IGNACIO, RUVALCABA
is_lateral_inspection
false