Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 8, 2019, 09:19 AM
  • 03 0431_03 0430_382019_025647.mp4

Date
03/08/2019
W/O
0759775
Weather
Light Rain
Operator/Surveyor
MARTIN
Sewer ID
Z00406
PipeID
P04979
Time
1:19 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1140
Sewer Name
03 WATER STREET TRUNK
City
LONG BEACH
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 03
Page No.
22
Purpose
Capital Improvement Program Assesment
Project
20190308MDM_WATER_STREET_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Upstream MH
03 0431
Downstream MH
03 0430
Dir. of Survey
Downstream
Length Surveyed
353.9 ft.
Total Length
353.9 ft.
Structural Index
3
Structural Quick
4135
Structural Rating
27
O&M Index
2
O&M Quick
3426
O&M Rating
24
Overall Index
3
Overall Quick
Overall Rating
51
Pipe schematic from manhole 03 0431 to 03 0430
MH: 03 0431MH: 03 0430downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MGO - General Observation - MAG COAT 85% START0 ft. AMH - Upstream Manhole, Survey Begins - 2:50AM0 ft. MWL - Water Level, 15 %of cross sectional area2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE24 ft. MGO - General Observation - MAG COAT 50%24 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - PEELING CONCRETE43.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG52.9 ft. ID - Infiltration Dripper, from 12 to 04 o'clock, within 8 inches of joint: YES52.9 ft. DAE - Deposits Attached Encrustation, 15 %of cross sectional area, from 11 to 04 o'clock, , within 8 inches of joint: YES60.5 ft. ID - Infiltration Dripper, from 08 to 04 o'clock, within 8 inches of joint: YES78 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERRE AGG84.8 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 12 o'clock, , within 8 inches of joint: YES84.8 ft. ID - Infiltration Dripper, from 08 to 12 o'clock, within 8 inches of joint: YES117.6 ft. SAP - Surface Aggregate Projecting, from 08 to 12 o'clock, within 8 inches of joint: YES - SEVERE AGG120.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE126 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Open179.2 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 12 to 04 o'clock, , within 8 inches of joint: YES187 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES196.7 ft. MGO - General Observation - 80% MAG COAT196.7 ft. IW - Infiltration Weeper, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - AT JOINTS235.6 ft. MGO - General Observation - 30% MAG COAT265.4 ft. MGO - General Observation - 90% MAG COAT273.4 ft. SAP - Surface Aggregate Projecting, from 12 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG285 ft. SSS - Surface Spalling, from 08 to 12 o'clock, within 8 inches of joint: NO - SIDE OF PIPE PEELING CONCRETE295.4 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE295.4 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG314.7 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES338.5 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES353.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG353.4 ft. IW - Infiltration Weeper, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - AT JOINTS353.4 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active353.4 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG353.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE353.9 ft. AMH - Downstream Manhole, Survey Ends - 3:30AM

Observation photos (17)

  • General Observation - MAG COAT 85% START

    0 ft. - General Observation - MAG COAT 85% START

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - PEELING CONCRETE

    24 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - PEELING CONCRETE

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    43.5 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Deposits Attached Encrustation, 15 %of cross sectional area, from 11 to 04 o'clock,  , within 8 inches of joint: YES

    52.9 ft. - Deposits Attached Encrustation, 15 %of cross sectional area, from 11 to 04 o'clock, , within 8 inches of joint: YES

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERRE AGG

    78 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERRE AGG

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 12 o'clock,  , within 8 inches of joint: YES

    84.8 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 12 o'clock, , within 8 inches of joint: YES

  • Surface Aggregate Projecting, from 08 to 12 o'clock, within 8 inches of joint: YES - SEVERE AGG

    117.6 ft. - Surface Aggregate Projecting, from 08 to 12 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE

    120.5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 12 to 04 o'clock,  , within 8 inches of joint: YES

    179.2 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 12 to 04 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES

    187 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES

  • Infiltration Weeper, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - AT JOINTS

    196.7 ft. - Infiltration Weeper, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - AT JOINTS

  • General Observation - 30% MAG COAT

    235.6 ft. - General Observation - 30% MAG COAT

  • Surface Aggregate Projecting, from 12 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

    273.4 ft. - Surface Aggregate Projecting, from 12 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Spalling, from 08 to 12 o'clock, within 8 inches of joint: NO - SIDE OF PIPE PEELING CONCRETE

    285 ft. - Surface Spalling, from 08 to 12 o'clock, within 8 inches of joint: NO - SIDE OF PIPE PEELING CONCRETE

  • Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    295.4 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

Observations (36)

DistanceCodeObservation
314.7DAE
78SAVSEVERRE AGG
24MGOMAG COAT 50%
338.5DAE
126TFOpen
353.4SAPSEVERE AGG
52.9ID
0MWM
353.4IWAT JOINTS
0MGOMAG COAT 85% START
2SAVSEVERE AGG
235.6MGO30% MAG COAT
117.6SAPSEVERE AGG
196.7MGO80% MAG COAT
84.8DAE
0AMH2:50AM
0MWL
179.2DAE
60.5ID
265.4MGO90% MAG COAT
295.4SAVSEVERE
353.4MGOConn. @ Mh, 9 O' Clock. Active
2SSSBLISTERING PEELING CONCRETE
120.5SSSPEELING CONCRETE
52.9DAE
353.4SAMSEVERE AGG
24SSSPEELING CONCRETE
273.4SAPSEVERE AGG
353.4SSSBLISTERING PEELING CONCRETE
196.7IWAT JOINTS
43.5SAPSEVERE AGG
295.4SAMSEVERE AGG
285SSSSIDE OF PIPE PEELING CONCRETE
353.9AMH3:30AM
84.8ID
187DAE

Properties (6)

custom_field_three
MISSING SEVERE AGG
custom_field_two
2
customer
LACSD
datetime
2019-03-08T01:19:24-08:00
documentation
MARTIN,REVELES,OLIVER 111,CASTILLO
is_lateral_inspection
false