Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 8, 2019, 08:59 AM
  • J 0209_J 0208_382019_053417.mp4

Date
03/08/2019
W/O
0755796
Weather
Light Rain
Operator/Surveyor
MARTIN
Sewer ID
Z00057
PipeID
P11453
Time
12:59 AM
Certificate
U-1014-06-22543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1141
Sewer Name
J JOINT OUTFALL J - UNIT 1E
City
PALOS VERDES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
48
Purpose
Capital Improvement Program Assesment
Project
20190308MDM_JOINT_OUTFALL_J_UNIT_1E
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Upstream MH
J 0209
Downstream MH
J 0208
Dir. of Survey
Downstream
Length Surveyed
64.8 ft.
Total Length
64.8 ft.
Structural Index
2
Structural Quick
2100
Structural Rating
2
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
2
Pipe schematic from manhole J 0209 to J 0208
MH: J 0209MH: J 0208downstream0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. OPEN0 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 5:35AM0 ft. MWL - Water Level, 5 %of cross sectional area8 ft. MGO - General Observation - 8" VCP44.5 ft. FC - Fracture Circumferential, from 10 to 11 o'clock, within 8 inches of joint: YES - SLIGHT64.8 ft. AMH - Downstream Manhole, Survey Ends - 5:45AM

Observation photos (2)

  • General Observation - Conn. @ Mh, 3 O' Clock. OPEN

    0 ft. - General Observation - Conn. @ Mh, 3 O' Clock. OPEN

  • General Observation - 8" VCP

    8 ft. - General Observation - 8" VCP

Observations (7)

DistanceCodeObservation
0MGOConn. @ Mh, 3 O' Clock. OPEN
44.5FCSLIGHT
0MWM
8MGO8" VCP
0AMH5:35AM
0MWL
64.8AMH5:45AM

Properties (6)

custom_field_three
SLIGHT FRACTURE
custom_field_two
3
customer
LACSD
datetime
2019-03-08T00:59:42-08:00
documentation
MARTIN,REVELES,OLIVER 111,CASTILLO
is_lateral_inspection
false