D 0087_D 0086_442019_122306.mp4
2 ft. - Surface Aggregate Projecting Chemical, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 70% MAG
80.9 ft. - General Photograph
158.4 ft. - General Photograph
183.1 ft. - General Photograph
183.1 ft. - Hole, at 12 o'clock, within 8 inches of joint: YES
268.5 ft. - General Photograph
| Distance | Code | Observation |
|---|---|---|
| 80.9 | MGP | — |
| 295.1 | SSS | — |
| 2 | SAPC | — |
| 183.1 | MGP | — |
| 305 | MGO | Conn. @ Mh, 3 O' Clock. Active |
| 0 | MWM | — |
| 0 | MWL | — |
| 2 | SSS | — |
| 295.1 | MGO | GREASE THROUGHOUT THE REACH (5%) |
| 295.1 | SRV | — |
| 295.1 | SAPC | — |
| 305 | AMH | 12:49 PM |
| 268.5 | MGP | — |
| 2 | SRV | — |
| 295.1 | SRV | — |
| 2 | SRV | — |
| 183.1 | H | — |
| 295.1 | MGO | Peeling & Flaking Throughout The Reach |
| 158.4 | MGP | — |
| 295.1 | SZ | 70% MAG |
| 0 | AMH | 12:20 PM |
| 2 | SZ | 70% MAG |